Orange County NC Website
Section Two 28 <br /> Experience <br /> • Evaluation of expansion options, including the re-routing of Rooty Branch <br /> • Design and implementation of a bentonite groundwater barrier and collection system along Rooty <br /> Branch and portions of Allen's Branch <br /> • Design, permitting and construction phase services for the Subtitle D Expansion Area <br /> • Permit modification for Phases 2-4 of the Expansion Area <br /> • Assistance with the cap modification for Phases 2-4 of the Expansion Area <br /> • Final closure design <br /> • Design, permitting, and construction phase assistance of a solid waste transfer station at the SRLF site <br /> • Design, permitting, and construction phase assistance with a recycling center at Quiocassin and Shane <br /> Road <br /> • Annual Life Expectancy Evaluations <br /> Construction and CQA Services <br /> Henrico County utilizes its internal construction services team to provide daily inspection services for all of its <br /> construction projects. Draper Aden Associates has, however, provided materials testing and CQA services for <br /> several construction projects, including: <br /> • Lined cell development at landfill #2 <br /> • Lined cell development (Phases 1 and 2) of current SRSL <br /> • Landfill gas system expansion <br /> • Landfill gas active remediation system <br /> • Bentonite slurry wall installation <br /> Landfill Gas Services x �' <br /> Henrico County generates revenue from an agreement with % <br /> a landfill gas (LFG)-to-energy vendor, Ingenco. Draper Aden VOtalt z: <br /> Associates maintains and optimizes the LFG wellfield to <br /> maximize these resources. In addition,we have been performing f) <br /> the following LFG services to the County: 0,42 4k LL _ <br /> q STF "` � ` <br /> • Manage Tier 2 sampling and analysis program W41 C. <br /> • Development and implementation of Gas Management ` a - <br /> Plan <br /> • Design and implementation of gas migration control system for Eastern Fill Area <br /> • Design and implementation of the installation of 19 new gas wells and the connection to the gas <br /> collection system <br /> • Monitoring of the gas probes for the entire facility <br /> • Preparation of and approval of the Title 5 permit for the facility <br /> • Monitoring, adjustment and maintenance of gas well field of 124 wells, all gas collection system header <br /> repairs, O&M of the blower flare station <br /> Draper Aden Associates <br /> Engineering • Surveying • Environmental Services <br />