Browse
Search
test
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2017
>
Agenda - 01-27-2017 - Board Retreat
>
test
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2017 3:32:02 PM
Creation date
11/1/2017 10:11:43 AM
Metadata
Fields
Template:
BOCC
Date
1/24/2017
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 7: Subdivisions 51 <br /> Section 7.4: Improvements and Performance Guarantees <br /> (B) An improvement shall be deemed completed only after the appropriate public agency has <br /> certified that the improvement(s) has been installed in accordance with the approved <br /> preliminary plat, the approved construction plan, and in accordance with applicable <br /> federal, state, and county regulations. <br /> (C) In lieu of certification from a public agency, the Planning Director is authorized to accept <br /> certification from the applicant's licensed professional engineer or licensed professional <br /> surveyor or other professional as authorized by the North Carolina General Statutes that <br /> the improvements have been installed in accordance with all applicable standards. <br /> 7.4.4 Performance Guarantees <br /> (A) Performance guarantees shall be required for the purpose of ensuring that <br /> subdividersl15��properly install all required subdivision improvements in a timely <br /> manner, in accordance with approved plats and construction plans. <br /> (B) The term of a performance guarantee shall not exceed two years. The Planning Director <br /> may, for good cause and with the approval of the provider of the guarantee, grant <br /> extensions of the term, with each such extension not to exceed one year. <br /> (C) Performance guarantees must be in the form of a performance bond, irrevocable letter of <br /> credit, or cash escrow account. The form of guarantee shall be determined by the <br /> subdividerer. <br /> (D) The performance guarantee shall be conditioned upon the performance of all work <br /> necessary to complete the required subdivision improvements within the time period <br /> specified at the time of preliminary plat or construction plan approval. <br /> (E) The amount of the performance guarantee shall equal at least 125% of the estimated <br /> cost, including project management costs, of the required improvements that have not <br /> been installed by the time of final plat submittal. <br /> (F) The estimated cost of required improvements, including project management costs, must <br /> be itemized by improvement type and certified by the subdivider41-e-ve-kap-e-rls.licensed <br /> professional engineer. In the case of minor subdivisions, the subdivider's licensed <br /> professional engineer or licensed professional surveyor may provide the itemized cost <br /> estimate. Cost estimates shall be based on industry norms within Orange County. <br /> (G) If a subdivider/develeper fails to properly install required improvements within the term of <br /> the guarantee, the guarantee will be deemed in default. In the case of default, the County <br /> is authorized to use the guarantee funds to complete the required subdivision <br /> improvements or to let a contract for installation of the required improvements. <br /> (H) Once the conditions of the performance guarantee have been completed to the <br /> satisfaction of the appropriate agencies and any required maintenance guarantee has <br /> been provided in accordance with the provisions of this Ordinance, the guarantee shall <br /> be released. <br /> (I) All improvements shall be completed in accordance with the conditions associated with <br /> the approved plat(s) and the applicable standards contained in this Article. No financial <br /> guarantee may be released until all required certifications of completion have been <br /> provided. <br /> (J) Once all of the required improvements have been at least 50% certified, the financial <br /> guarantee may be reduced by the ratio that the completed improvements bear to the total <br /> improvements required. However, only one such reduction shall be permitted prior to <br /> releasing the entire performance guarantee. <br /> 15 Staff is attempting to standardize terminology. We use the term 'subdividers'and 'developers' interchangeably <br /> but they can actually mean vastly different things. We are eliminating the use of the term'developer' in Article 7 <br /> and relying solely on 'subdivider'. <br /> Orange County, North Carolina—Unified Development Ordinance Page 7-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.