Orange County NC Website
3 <br />Roof Replacement -Selected Areas <br />New Courthouse, Court Street Annex, <br />Efland Cheeks Community Center, <br />Northside Buildings 1, 2, and 3 <br />V Northside Buildings 1, 2, and 3 <br />Buildings 1 and 3 <br />A. Demolition <br />8. Wood Decking <br />G Shingles and Underlayment <br />D Metal Flashing <br />E. Other Items <br />Subtotal -Buildings 1 and 3 <br />Building 2 <br />A Demolition <br />B. Decking <br />C. Wood Nailers and Blocking <br />D Base Sheet <br />E Boad insulation <br />F Modified Bituminous Membrane <br />G. Single Ply Membrane <br />H, Metal Flashing <br />L. Other Items <br />J Warranty (Modified Membrane) <br />K Warranty (Single Ply Membrane) <br />Subtotal -Building 2 <br />Subtotal -Northside Buildings 1, 2, and 3 <br />S 21,900 $ 18,902 <br />$ 300 $ 156 <br />$ 10,953 $ 40,831 <br />$ 37,275 S 43,107 <br />$ 40,170 $ 25,863 <br />$ 110,598 $ 128,859 <br />$ 21,098 S 14,039 <br />S 1,000 $ 1,044 <br />$ 750 $ 200 <br />$ - $ 8,875 <br />$ - $ 13,693 <br />$ 43,954 $ 6,976 <br />$ 5,276 $ 45,543 <br />$ 16,843 $ - <br />$ - $ 12,318 <br />S - S 835 <br />$ - $ 750 <br />$ 88,921 $ 104,273 <br />$ 199,519 $ 233,132 <br />CERTIFIED BID TAB <br />Bids Received -October 20, 2005 <br />5 <br />$ <br />$ <br />$ <br />$ <br /> <br />$ <br />$ <br />5 <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />Total Base Bid $ 642,944 $ 583,440 `$ <br />{General Items and Work Items) <br />ALTERNATE N0.1 <br />Remove Skylight @Northside Bidg No 2 $ 19,684 $ 4,376 $ <br />Total -Alternate No. 1 $ 19,684 $ 4,376 $ <br />ALTERNATE NO 2 <br />A Windows;Paint <br />New Courthouse $ 28,429 S 11,832 $ <br />New Courthouse Addition $ 42,844 $ 26,623 $ <br />8 Storm Windows $ - 5 27,569 $ <br />Total- Alternate No.2 $ 71,273 $ 66,044 $ <br />Total Bid $ 733,901 $ 653,860 $ <br />(Including Alternates) <br />Jeffrey L Spady, RRC <br />Sr Principal <br />Note: <br />«"` Includes equipment & rentals. permit fees, taxes and fl ashing not in cluded in D&E <br />Bid submitted by GFE is mathematically incorrect <br />Bid submitted in proposal was $587,316 -the amou nt shown herein is mathmaticaliy correct <br />18,902 <br />156 <br />40,831 <br />43,107 <br />25,863 <br />128,859 <br />14,039 <br />1,044 <br />20C <br />8,875 <br />13,693 <br />6,97E <br />45,543 <br />12,318 <br />835 <br />75C <br />104,273 <br />233,132 <br />4,376 <br />4,376 <br />$ 5,700 <br />$ 200 <br />$ 35,000 <br />$ 25,300 <br />$ 3,500 <br />$ 69,700 <br />$ 8,400 <br />$ 400 <br />$ 250 <br />$ 1,500 <br />$ 20,000 <br />$ 20,000 <br />$ 20,000 <br />$ 14,450 <br />$ 7,600 <br />$ 2,000 <br />$ 2,000 <br />$ 96,600 <br />$ 166,300 <br />$ 633,720 <br />$ 21,000 <br />$ 21,000 <br />11,832 $ 38,000 <br />26,623 $ 85,500 <br />27,589 $ 34,000 <br />66,044 $ 157,500 <br />559,270 $ 812,220 <br />