Browse
Search
Agenda - 11-15-2016 - 7-c - Durham-Orange Light Rail Transit Project - North Carolina Central University Extension
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2016
>
Agenda - 11-15-2016 - Regular Mtg.
>
Agenda - 11-15-2016 - 7-c - Durham-Orange Light Rail Transit Project - North Carolina Central University Extension
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2016 2:56:50 PM
Creation date
11/1/2017 10:09:51 AM
Metadata
Fields
Template:
BOCC
Date
11/15/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7c
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> MPO Board 10/19/2016 <br /> Based on recent direction from the FTA, the D-O LRT project must enter the New Starts <br /> Engineering phase by February 2017. In order for the NCCU Station to advance into <br /> Engineering with the rest of the D-O LRT Project and qualify for the 50% Federal match <br /> for this project, two things must happen by December 2016: the LPA must be amended <br /> to include the NCCU Station and the amended LPA must be included in the 2040 MTP. <br /> Attachments <br /> • Map of the recommended LPA, which includes the NCCU Station <br /> Staff Contact(s) <br /> • Danny Rogers, D-O LRT Project Director, GoTriangle, 919-485-7579 <br /> drogers@gotriangle.org <br /> • Patrick McDonough, Manager of Planning and TOD, GoTriangle, 919-485-7455 <br /> pmcdonough @gotriangle.org <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.