Orange County NC Website
5 <br /> MPO Board 10/19/2016 <br /> Based on recent direction from the FTA, the D-O LRT project must enter the New Starts <br /> Engineering phase by February 2017. In order for the NCCU Station to advance into <br /> Engineering with the rest of the D-O LRT Project and qualify for the 50% Federal match <br /> for this project, two things must happen by December 2016: the LPA must be amended <br /> to include the NCCU Station and the amended LPA must be included in the 2040 MTP. <br /> Attachments <br /> • Map of the recommended LPA, which includes the NCCU Station <br /> Staff Contact(s) <br /> • Danny Rogers, D-O LRT Project Director, GoTriangle, 919-485-7579 <br /> drogers@gotriangle.org <br /> • Patrick McDonough, Manager of Planning and TOD, GoTriangle, 919-485-7455 <br /> pmcdonough @gotriangle.org <br /> Page 2 of 3 <br />