Browse
Search
Agenda - 04-02-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 04-02-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2017 4:48:27 PM
Creation date
10/30/2017 4:38:14 PM
Metadata
Fields
Template:
BOCC
Date
4/2/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> Action Agenda <br /> Item No. N44:7 <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: April 2 , 1990 <br /> SUBJECT: ACCEPTANCE OF FINAL AIRPORT REPORT/CLOSE OUT OF PROJECT <br /> DEPARTMENT: PURCHASING/CENTRAL SRVS. PUBLIC HEARING YES: NO: XX <br /> ATTACHMENT(S) : INFORMATION CONTACT: Pam Jones <br /> REPORT ( under separate cover ) ext 498 <br /> Telephone Number- <br /> Hillsborough -732-8181 <br /> Chapel Hill -967-9251 <br /> Mebane -227-2031 <br /> Durham -688-7331 <br /> PURPOSE: To accept the final report regarding the airport proposed in <br /> Orange County and to authorize Purchasing Director to close <br /> out the project with the State of North Carolina. <br /> BACKGROUND: In late 1988 the Board of Commissioners authorized a <br /> feasibility study of siting a new general aviation airport in Orange <br /> County. In May, 1989 the Board determined there was no such <br /> appropriate site and the process was halted. <br /> The engineering firm of Wilbur Smith Associates provided services <br /> associated with the potential siting. It is required that the Board <br /> accept their final report in order that the paperwork can be filed with <br /> the NC DOT-Aviation and the project closed out . <br /> RECOMMENDATION: Accept final report ; and authorize the Purchasing and <br /> Central Services Director to file the necessary paperwork to close out <br /> the project . <br />
The URL can be used to link to this page
Your browser does not support the video tag.