Orange County NC Website
each lot contains a suitable area for septic disposal. - -17 <br /> �. <br /> North Carolina Department f <br /> 4. ' The'� of . . <br /> �� w <br /> that Daniels Farm Road Transportation shall certify <br /> has been constructed to State <br /> standards or that Construction Plans have been approved. <br /> 5.. A Certificate of Approval signed by the Orange County <br /> Planning and Inspections Department. <br /> Signature of Applicant Clerk to the Board <br /> I, , accept the above listed conditions of <br /> subdivision approval, and acknowledge that each must be met prior to <br /> recordation of the final plat. <br /> • <br />