Browse
Search
Agenda - 02-28-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 02-28-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2017 4:31:09 PM
Creation date
10/30/2017 4:10:24 PM
Metadata
Fields
Template:
BOCC
Date
2/28/1990
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 Notes <br /> Continued <br /> (5) Same as (4) , except that existing lots scalier than 5 acres <br /> are developed at their platted densities. <br /> (6) Same as (5) , except that owners may create up to 5 2-acre <br /> lots from existing parcels. (This scenario was proposed in <br /> the October 1989 13-Point Agreement. ) <br /> (7) Same as (6) , except that average impervious coverage is <br /> increased from 6 to 7% for two-acre lots, and decreased from <br /> 20 to 15% for half-acre lots, as proposed by Orange County <br /> on February 5, 1990. Chlorophyll concentrations were <br /> interpolated from values derived with the CDM model. <br /> (8) Assumes 90% buildout of all undeveloped land at a density of <br /> 1 unit per 2 acres. Does not account for existing lots of <br /> record that may be smaller than 2 acres. <br /> (9) Assumes 90% buildout according to currently approved local <br /> land use and zoning plans. <br /> ( 10) Assumes 90% buildout at density of 1 unit per acre. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.