Orange County NC Website
36 <br /> s <br /> Planning Department shall also consider the general <br /> suitability of the land for development to avoid <br /> unnecessary expense in the redesign of acceptable <br /> subdivision proposals. The Planning Department <br /> shall review the proposal for compatibility with <br /> - the Orange County Comprehensive Plan and, in <br /> particular, determine if proposed sites for schools <br /> and other public/private facilities are to be <br /> reserved and/or provided. <br /> The Planning Department shall review the proposed <br /> Concept Plan during the 30-day period following <br /> acceptance of the application. A written analysis <br /> and recommendation shall be submitted to the <br /> Planning Board at its first regular meeting <br /> following the 30-day review period Within forty- <br /> five (45) days of the date of acceptance of the <br /> Concept Plan or within such further time consented <br /> to in writing by the applicant. the Planning <br /> Department shall submit to the Planning Board a <br /> written analysis of the Concept Plan and its <br /> recommendation. If the Planning Department fails <br /> to prepare a report to the Planning Board within <br /> the specified time period, or extension thereof, <br /> the Concept Plan is recommended without conditions . <br /> ********************************** <br /> ORDINANCE REVIEW SUBCOMMITTEE: 12/20/89 <br /> The Ordinance Review Committee acknowledged the problem with <br /> the existing time limits and recommended approval of the <br /> amendment. <br /> PLANNING BOARD REVIEW: <br /> BOCC REVIEW: <br />