Browse
Search
Agenda - 02-20-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 02-20-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2017 4:03:37 PM
Creation date
10/30/2017 3:53:29 PM
Metadata
Fields
Template:
BOCC
Date
2/20/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M. <br /> t <br /> 22. <br /> 1994 PROGRAM SUMMARY <br /> PROBLEM/CONCERN (continued) <br /> SOLUTION(Deseribe the sups that were taxen by <br /> the county/department t°remedy the problem or to address the <br /> cones. Explain how the program's objectives were met) <br /> Standardized signage of all county wither <br /> for the public to locate county s ery <br /> interrelated functions were chosen for the initial project. <br /> permits and information regarding building/land improvements need <br /> Citizens seeking p These' buildings are <br /> services from the Planning Department and Tax and Land Records. <br /> two miles apart and are not near other government buildings. The first signage project <br /> was to link these two buildings. <br /> Each exterior sign was 4+0" x 60" and contained the street of eachelountyifacility. <br /> They were placed so that they could be read from <br /> locate the needed service without leaving their automobile. The interior signs were <br /> a floorplan of the building and were located at all major entrances. <br /> The signs had to conform to the local Historic Commission' s requirements and were <br /> designed to blend in with the Colonial theme of the area. Special painCaslon <br /> Style lettering were used. All signs were color coded and could be easily read <br /> and understood. <br /> After the initial project had been in place for one month, the employees in the affected <br /> departments were surveyed. Their positive response led to the continuance of the <br /> project to other facilities. <br /> 3 . <br /> _____ <br /> ■•1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.