Browse
Search
Agenda - 02-05-1990 (2)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 02-05-1990 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2017 12:04:19 PM
Creation date
10/30/2017 3:42:48 PM
Metadata
Fields
Template:
BOCC
Date
2/5/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT C 15 <br /> REVISED: DECEMBER 01, 1989 <br /> UNIVERSITY LAKE WATERSHED PROTECTION PROPOSAL <br /> TENTATIVE <br /> WORK SCHEDULE <br /> NOVEMBER 15, 1989 - DECEMBER 15, 1989 <br /> Staffs of Orange County, Chapel Hill and Carrboro to prepare the <br /> following materials: <br /> 1. Informational materials for the public to be distributed <br /> before the public meeting including means of distribution <br /> (i.e. media) and schedule for distribution. <br /> 2. Draft of "Development Standards" including: <br /> a) Lot placement to minimize waterquality impacts for <br /> 1) cluster subdivisions <br /> 2) standard lot subdivisions <br /> b) Siting of structures. - <br /> c) Septic tank setbacks from streams. <br /> d) Stream buffer requirements. • <br /> e) Open space set aside in cluster development to prohibit <br /> further subdivision. -- - - -; <br /> f) Placement and character of: <br /> 1) driveways • <br /> 2) roads <br /> • <br /> g) Definition of impervious surfaces. <br /> 3. Proposed amendments to the Orange County Zoning Ordinance <br /> and Subdivision Regulations and amendments to the <br /> Carrboro Land Use Ordinance which will incorporate the <br /> "Development Standards" as well as the- Orange-Chatham <br /> Work Group's proposed approach to development outlined <br /> below: <br /> A. BASIC STRATEGY <br /> Minimum lot size 5 acres <br /> Density 1 unit per 5 acres <br /> Impervious Surface 4% <br /> Wastewater Disposal Individual, on-site septic with <br /> public monitoring or alternative <br /> disposal with Board of Health <br /> oversight and inspection. <br /> Stormwater Onsite structural BMP's not <br /> required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.