Browse
Search
Agenda - 02-05-1990 (2)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 02-05-1990 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2017 12:04:19 PM
Creation date
10/30/2017 3:42:48 PM
Metadata
Fields
Template:
BOCC
Date
2/5/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to the adequacy of the draft study for two major reasons . <br /> First , <br /> circulated the Draft EIS was not properly or legally 1502. 19 o int Cc) • <br /> citizens which is a violation of Federal Regulation <br /> That regulation requires free and wide access to the environmental <br /> study for everyone who wants to participate in the leg required <br /> and very important public input process. By printing only 280 <br /> copies for a metropolitan area the size of Raleigh and by charging <br /> citizens $ 20 for what should be a free public document your <br /> department has illegally restricted access to the Draft EIS and <br /> has violated both NEPA and SEPA. Second , the Draft EIS fails to <br /> adequately consider mass transit as the single most attractive <br /> alternative . Section 2 .2 .2 .2 attempts to very quickly <br /> light rail as an alternative and obviously does not meet the <br /> requirements of Federal Regulation 1502 .14 . request <br /> Because of these serious legal deficiencies , we re quest , <br /> that the Draft EIS be reprepared to include a complete ,proposal <br /> objective and substantial treatment of our enclosed prof <br /> for the Triangle Express as a viable and attractive alternativer- <br /> to the environmentally damaging outer loop g Y in our wat <br /> sheds . And , we request that the new Draft EIS be widely and tfreely <br /> distributed to everyone on your mailing list for the projec <br /> everyone who requests a copy . Of course we would also expect that <br /> the environmental studies on the north Durham loop would also <br /> include complete information and a fair comparison of =ass transit <br /> as an alternative when the studies are prepared in the future . <br /> We believe that as we enter the 1990s , mass transit is an <br /> idea whose time has come for the Triangle area. Instead of <br /> polluting our drinking water supplies and spending $ 750 ,000 ,000 on <br /> new super highways in our ecologically sensitive watersheds , why <br /> not build a modern , state of the art , mass transit system that <br /> would link all of the Triangle area and keep our drinking water <br /> and our air clean ? <br /> Will you please direct your staff to reprepare the Draft <br /> . EIS to include the Triangle Express as an alternative and to <br /> widely and freely distribute the study when it is completed 7 <br /> Hay we hear from you on this important matter ? <br /> Thank you for your cooperation. Please include these <br /> comments in the EIS . <br /> Sincerely, <br /> A.1.-J.0A---e.-- <br /> m Clark <br /> President <br />
The URL can be used to link to this page
Your browser does not support the video tag.