Orange County NC Website
3 <br /> occurs on a separate lot from the <br /> source of wastewater generation. <br /> b) No more than five new lots may be <br /> created through any development <br /> application where the size of any <br /> lot is less than five acres. Where <br /> the minimum size of all lots is <br /> greater than five acres, there is no <br /> restriction on the number of new <br /> lots which may be created. <br /> PROPOSED AMENDMENT: Subdivision Regulations <br /> IV-C-2. Interim Development Standards Approved <br /> The following interim development standards have <br /> been enacted and shall remain in full force and <br /> effect until the termination date specified herein. <br /> Thereafter, the standards are void and of no <br /> effect. <br /> a. University Lake Water Supply Watershed <br /> 3. Na of Standards -- The following <br /> interim development standards shall <br /> apply: <br /> a) 3e-- sic Revuirements: In the <br /> University Lake water supply <br /> watershed, the minimum required lot <br /> size shall be five acres, and the <br /> overall residential density for any <br /> development application shall not <br /> exceed one dwelling unit per five <br /> acres, except as provided below. In <br /> addition, the impervious surface <br /> ratio for eac development shall not <br /> exceed four percent. Structural <br /> •.best management practices, such as <br /> wet detention basins, are not <br /> required except as may be required <br /> below. <br /> b) Cluster Alternative: Cluster <br /> developments are permitted <br /> subject to the following development <br /> standards: <br />