Browse
Search
Agenda - 02-05-1990 (2)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 02-05-1990 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2017 12:04:19 PM
Creation date
10/30/2017 3:42:48 PM
Metadata
Fields
Template:
BOCC
Date
2/5/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> single or multiple user system will <br /> be permitted where effluent disposal <br /> occurs on a separate lot from the <br /> source of wastewater generation. <br /> b) No more than five new lots may be <br /> created through any development <br /> application where the size of any <br /> lot is less than five acres. Where <br /> the minimum size of all lots is <br /> greater than five acres, there is no <br /> restriction on the number of new <br /> lots which may be created. <br /> PROPOSED AMENDMENT: Zoning Ordinance <br /> 6. 15.2 Interim pevelopment Standards proved <br /> The following interim development standards have <br /> . . been enacted and shall remain in full force and <br /> effect until the termination date specified herein. <br /> Thereafter, the standards are void and of no <br /> effect. <br /> a. University Lake Water Supply watershed <br /> 3. Nature p Standards - The following <br /> interim development standards shall <br /> apply: <br /> a) Basic Recuirements: In the <br /> University Lake water supply <br /> watershed, the minimum required lot <br /> size shall be five acres, and the <br /> overall residential density for any <br /> development application shall not <br /> exceed one dwelling unit per five <br /> . acres, except as provided below. In <br /> addition, the impervious surface <br /> :. ratio for eac . development shall not <br /> exceed four percent. Structural <br /> best management practices, such as <br /> wet detention basins, are not <br /> required except as may be required <br /> below. <br /> b) Cluster Alternative: Cluster <br /> developments are permitted <br />
The URL can be used to link to this page
Your browser does not support the video tag.