Orange County NC Website
/ 5 <br /> February 6, 1989 Page 10 <br /> DESIGN DEVELOPMENT PHASE <br /> Project: Orange Co. K-6 School <br /> L. ESTIMATE OF PROBABLE CONSTRUCTION COST <br /> Gross Area = 99,328 GSF <br /> @ $65 to $70/GSF = $6,456,320 to $6,952,960 <br /> This includes sitework, landscape, building, built-in casework and <br /> kitchen equipment. Movable furniture, kitchen utensils or small wares <br /> are not included. Land cost and A&E fees are not included. This esti- <br /> mate is made at the Design Development Phase and is based on a num- <br /> ber of assumptions. Estimates after construction documents are pre- <br /> pared may vary from this estimate. Actual bids may vary from all esti- <br /> mates. <br /> END <br /> �[frr <br /> W.T. Doggett, AIA <br /> DOGGETT ARCHITECTS, INC. <br /> WTD :jdd <br /> cc: Dr. Dan Lunsford, Superintendent <br /> Board of Education Members <br /> File 8802-DD1 <br /> r <br /> r <br />