Orange County NC Website
Those opposing approval of the application on the 7 <br /> grounds that the use will not promote the public <br /> health, safety and general welfare , will not <br /> maintain or enhance the value of contiguous <br /> property or is not in compliance with the general <br /> plans for the physical development of the County <br /> shall have the burden of establishing, by competent <br /> material and substantial evidence the specific <br /> manner in which. the proposed use does not satisfy <br /> the requirements for approval of the application <br /> for a Special Use. <br /> 8.2 .3 RESERVED <br /> 8.2 .4 In addition to the general standards stated in 8 .2 <br /> the following specific standards shall be addressed <br /> by the applicant before the issuance of a Special <br /> Use Permit: <br /> a) Method and adequacy of provision of sewage <br /> disposal facilities , solid waste, and water . <br /> b) Method and adequacy of police, fire and rescue <br /> squad protection. <br /> c) Method and adequacy of vehicular access to the <br /> site and traffic conditions around the site . <br /> l • .d) Other use specific standards are set forth in <br /> • <br /> Section 8 . 8 . <br /> 8 .3 <br /> To Approve Or Disapprove <br /> There is hereby established two classes of Special <br /> Uses which shall be approved or disapproved as <br /> shown: <br /> Class A -- Approved or disapproved by Board of <br /> Commissioners <br /> • <br /> Class B - Approved or disapproved by Board of <br /> Adjustment <br /> 8 .4 ' Procedure For Submission and Cor.side-atipn of <br /> 8 .4 .1* xe rpi'c„zt. on -on`er,e )o <br /> *Amended Prior ' to the application being received as <br /> 6-5-86 prescribed in Article 8 .4 .2 . the applicant must <br /> . .request a pre-application meeting . with the Orange <br /> J County Planning Department . A sketch plan illus- <br /> trating the location, size and major design ele- <br /> ments of the development of the site must be <br /> submitted five (5) working days prior to the pre- <br /> application meeting. The Planning Department may <br /> p_•7a <br />