Browse
Search
2017-597-E ES - Pendergraph Electric, Inc. to install electrical outlets in the IT room for 911 backup call center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-597-E ES - Pendergraph Electric, Inc. to install electrical outlets in the IT room for 911 backup call center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2018 10:16:41 AM
Creation date
10/27/2017 4:39:39 PM
Metadata
Fields
Template:
Contract
Date
11/6/2017
Contract Starting Date
11/6/2017
Contract Ending Date
12/31/2017
Contract Document Type
Contract
Amount
$730.00
Document Relationships
R 2017-597-E ES - Pendergraph Electric, Inc. to install electrical outlets in the IT room for 911 backup call center
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:9B13161F-1708-4ED3-8A2A-1C2D92E703C7 <br /> PROPOSAL <br /> Pendergraph Electric Inc. <br /> 1910 E.Pettigrew Street <br /> Durham NC 27703 <br /> (P)919-596-9328 (F)919-596-9329 <br /> Proposal submitted to Phone Date 10/19/2017 <br /> Angela Barnes <br /> Street Job Name Town of Hillsborough West Campus Office <br /> City State Zip Job Location <br /> Basement Server Room <br /> We hereby submit specifications and estimates for: <br /> Provide(2)Quad Outlets on(2)circuits @ basement server room as discussed <br /> WE PROPOSE hereby to furnish material and labor complete in accordance with above specifications,for the sum $730.00 <br /> Authorized Signature: Steve Pendergraph <br /> NOTE: This proposal may be withdrawn by us if not accepted within: (30)Thirty days <br /> All material is guaranteed to be specified. All work to be completed in a workmanlike manner according to standard practices. Any alterations or <br /> deviation from above specifications involving extra costs will be executed only upon written orders,and will become an extra charge over and above <br /> estimate. All agreements contingent upon strikes,accidents or delays beyond our control. Owner to carry fire,tornado and other necessary <br /> insurance. Our workers are fully covered by Workers Compensation Insurance. <br /> ACCEPTANCE OF PROPOSAL-the above prices,specifications and conditions are satisfactory and are hereby accepted. <br /> You are authorized to do the work as specified. Payment will be made as outlined above. <br /> Date of Acceptance: Signature: <br /> Signature: <br />
The URL can be used to link to this page
Your browser does not support the video tag.