Browse
Search
Agenda - 11-02-2017 - 6-a - Award of Southern Campus Expansion Professional Services Agreement.pdf
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 11-02-2017 - Regular Mtg.
>
Agenda - 11-02-2017 - 6-a - Award of Southern Campus Expansion Professional Services Agreement.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2017 8:53:20 AM
Creation date
10/27/2017 9:19:25 AM
Metadata
Fields
Template:
BOCC
Date
11/2/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19 <br /> 00000 00100 100 11111111 <br /> u. 111111111 <br /> un:11111 11111111111111111111111 rim <br /> HOURLY RATES: <br /> All Additional Services are to be mutually determined and agreed to in writing prior to the <br /> commencement of the work. Hourly rates, if needed for additional services, for Architect and <br /> Engineers shall be provided as follows: <br /> Architectural: <br /> Principal $ 150/hour <br /> Project Manager $ 130/hour <br /> Architect $ 110/hour <br /> Designer $ 90/hour <br /> Clerical $ 60/hour <br /> NOT INCLUDED WITHIN PROPOSED FEE (See Consultant lists as well, as they are included as <br /> part of this document): <br /> • Subsurface Survey, Topographic Survey, Hazardous Materials Survey and Testing <br /> • Construction Testing Services <br /> • Cemetery mitigation <br /> • Special Inspection services as described in Chapter 17 of the NC Building Code. <br /> • Commissioning <br /> • LEED Certification <br /> • Measured Drawings <br /> • Conformed Drawings <br /> • Furniture, Furnishings and Equipment <br /> • All permit application fees, permit fees to NCDOT, Town of Chapel Hill, and NCDENR <br /> • Environmental Impact Statement, Flood studies, and/or Traffic Studies <br /> • Asbestos Abatement <br /> Reimbursable Expenses <br /> Reimbursable expenses include, but may not be limited to, all review and permit fees, overnight <br /> postage, mileage, and reproduction and printing costs. The Architect will provide prints to the Owner if <br /> requested, otherwise the Owner may elect to print documentation directly in house. <br /> Instruments of Service <br /> Plans and specifications are instruments of service and remain the property of Smith Sinnett <br /> Architecture, P.A. <br /> Indemnification <br /> Architect and Client agree to mutually indemnify,defend and hold each other harmless from and against <br /> any and all claims, liabilities, suits, demands, losses, costs and expenses, including, but not limited to, <br /> reasonable attorneys'fees and all legal expenses and fees incurred on appeal, and all interest thereon, <br /> accruing or resulting to any and all persons,firms or any other legal entities on account of any damages <br /> or losses to property or persons, including injury or death, or economic losses, arising out of the Project <br /> and/or the performance or non-performance of obligations under this Agreement, except to the extent <br /> such damages or losses are found by a court or forum of competent jurisdiction to be caused by the <br /> Architect's or Client's negligent errors or omissions. <br /> 4600 I.....alke Boone .i iralili, Suite 205 IRalieli€ Ih, NC 27607 919.781.8582 II...IUB Certified <br /> www.r,::,inrli.I� (,:'Aliinnett.cc:ainr <br />
The URL can be used to link to this page
Your browser does not support the video tag.