Browse
Search
2017-573-E AMS - Harris Bros. Electric & Controls, Inc. for motorpool air compressor repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-573-E AMS - Harris Bros. Electric & Controls, Inc. for motorpool air compressor repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2018 11:15:43 AM
Creation date
10/19/2017 8:03:30 AM
Metadata
Fields
Template:
Contract
Date
10/9/2017
Contract Starting Date
10/9/2017
Contract Ending Date
10/31/2017
Contract Document Type
Contract
Amount
$969.00
Document Relationships
R 2017-573-E AMS - Harris Bros. Electric & Controls, Inc. for motorpool air compressor repair
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 3BD8OFE0-64C4-46A0-A78C-24DDE4774C71 <br /> Harris Bros. Electric & Controls, Inc. <br /> 2712 Hillsborough Road <br /> Durham, NC 27705 <br /> Phone: (919) 220-8500 ** Fax: (919) 220-7009 <br /> BID PROPOSAL <br /> Date: October 3, 2017 <br /> To: Allen Dorman <br /> Company: Orange County <br /> Phone: 919-619-8859 <br /> E-mail: an t y,ra(Ira li e°tntrol;: g_: r <br /> From: Calvin Harris <br /> Company: Harris Bros. Electric 8s Controls, Inc. <br /> Telephone: (919) 220-8500 <br /> Fax: (919) 220-7009 <br /> Email: calvinrharris@msn.com <br /> Project: Orange County Motor Pool Air Compressor <br /> Scope of Work: <br /> • Priced to use the existing (2) 100A disconnects to feed the new 20HP air <br /> compressor <br /> • Use (1) of the 100A disconnects with fuse reducers to get a 20A/120V for controls <br /> • Use the other 100A disconnect, but upsize the fuse to 80A <br /> • Electrical permit included <br /> Total Base Bid: $969.00 (Nine Hundred Sixty-Nine Dollars) <br /> Notes: <br /> • Work to be done during normal business hours. <br /> • Bid good for 30 days. <br />
The URL can be used to link to this page
Your browser does not support the video tag.