Orange County NC Website
DocuSign Envelope ID:5A7B2937-A688-4E52-BA63-8DF750C7B5A4 <br /> 111111111111111 111111111r.. <br /> Powering(usurers Vlri�ridW* <br /> f. Adjust all panel meters to measured values <br /> g. System Bypass Voltages (all phases) <br /> h. Manual and UV Transfer Testing, verify uninterrupted transfer waveform (if applicable) <br /> i. Outage simulation, and battery capability testing, and verify charger current limit <br /> j. Generator operation and interface verification (if applicable) <br /> 4. Environmental Parameters <br /> a. UPS area ambient temperature and condition of ventilating equipment <br /> b. General Cleanliness of UPS Power Module <br /> c. General Cleanliness of UPS area <br /> d. Replace air filters as applicable and necessary(parts if required are included at no <br /> charge under service agreements with full parts coverage, otherwise billable) <br /> e. Clean outside of UPS including control panel/CRT screen <br /> f. Flywheel only: Drain oil and change oil and filters NOTE: One (1) oil and filter change <br /> per year. <br /> 5. Battery Cabinet Checks <br /> a. General appearance of Battery System (all types) <br /> b. General cleanliness of Battery System area (all types) <br /> c. Inspect cells for physical abnormalities <br /> d. Inspect all DC connections for abnormalities <br /> e. Battery System area ambient temperature and condition of ventilating equipment <br /> f. For internal batteries only measure and record: <br /> i. Overall battery float voltage <br /> ii. Charger output current and voltage <br /> iii. Negative terminal temperature of one cell/battery per battery cabinet shelf or rack <br /> tier <br /> iv. Momentary load testing of cells < 100 watts (e.g. 9E, 9x55, not 9330) <br /> 6. Monitoring System Parameters <br /> a. Alarm archive review and printing <br /> b. Alarm lamp test-local and remote (if applicable) <br /> c. Replace all open monitor bulbs <br /> d. If work is completed under a PowerTrust Ultra contract, inspect battery monitoring system <br /> e. Review Battery Test in history(if applicable) <br /> 7. General <br /> a. Customer Consultation <br /> b. Verbal Recommendations <br /> c. General Observations <br /> Following the Preventive Maintenance inspection, a written report will be provided detailing the results of <br /> the inspection, and making specific recommendations toward future remedial action, upgrades, or <br /> sparing. <br /> Eaton and PowerTrust are trade names,trademarks,and/or service marks of Eaton Corporation or its subsidiaries and affiliates. <br /> Scope of Work Attachment R-2 <br /> Revision 10/14 <br /> Page 2 of 2 <br />