Browse
Search
Agenda - 10-17-2017 - 8-a - Minutes
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 10-17-2017 - Regular Mtg.
>
Agenda - 10-17-2017 - 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2017 3:44:27 PM
Creation date
10/13/2017 9:59:54 AM
Metadata
Fields
Template:
BOCC
Date
10/17/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 10-17-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> 1 CBGI — The Competition <br /> 2 • $11 million budgeted for this initiative <br /> 3 • Each county in the North Central Zone can submit 1-3 projects that total no more than <br /> 4 $1.5 million per county <br /> 5 • The counties in the North Central Zone are Chatham, Durham, Edgecombe, Franklin, <br /> 6 Granville, Harnett, Johnston, Lee, Nash, Orange, Person, Vance, Wake, Warren <br /> 7 and Wilson. <br /> 8 • Not all counties will have funded projects <br /> 9 <br /> 10 CBGI Timeline - chart <br /> 11 <br /> 12 PFAP Cold-Chain and Co-Packing <br /> 13 Regional cold-chain and co-packing <br /> 14 • $120,000 to expand the existing freezer capacity <br /> 15 • $160,000 to install the co-packing line and to hire and train staff <br /> 16 <br /> 17 Hillsborough EDD-Water and Sewer Infrastructure <br /> 18 • Will serve up to 184 acres located along the Interstate 40 <br /> 19 • Scheduled for completion in March 2019 <br /> 20 • Grant funds will be utilized for design and construction work <br /> 21 <br /> 22 Eno EDD-Gravity sewer extension <br /> 23 • 7,700 feet of gravity sewer infrastructure <br /> 24 • Will serve up to 150 acres located along the Interstate 40/85 and US 70 corridor <br /> 25 • Scheduled for completion in November 2018 <br /> 26 • Grant funds will be utilized for construction work <br /> 27 <br /> 28 Buckhorn-Mebane EDD-Gravity sewer extension <br /> 29 • 10,000 feet of gravity sewer infrastructure <br /> 30 • Will serve up to 281 acres located along the Interstate 40/85 corridor <br /> 31 • Scheduled for completion in December 2022 <br /> 32 • Grant funds will be utilized for design and construction work <br /> 33 <br /> 34 Old 86 Light Industry/Flex Park- Town of Carrboro <br /> 35 Infrastructure cost of a light industry/flex park <br /> 36 • 3500 foot extension of sewer to the site and needed road improvements <br /> 37 • Will serve up to 22 acres of town owned property located at 7917 Old 86, in a rural area <br /> 38 of Orange Co. <br /> 39 • Scheduled for completion in June 2019 <br /> 40 <br /> 41 Recommendations: <br /> 42 Submit three projects totaling $1.5 million <br /> 43 • Hillsborough Economic Development District water and sewer infrastructure - $400,000 <br /> 44 • Town of Carrboro light industry/flex park - $820,000 <br /> 45 • Piedmont Food & Agricultural Processing Center (PFAP) Proposal Regional Cold-Chain <br /> 46 and Co-packing Initiative - $280,000 <br /> 47 <br /> 48 Commissioner Burroughs referred to Carrboro's application, and asked if Carrboro has <br /> 49 already applied for the USDA funds. <br />
The URL can be used to link to this page
Your browser does not support the video tag.