Orange County NC Website
29 <br /> Attachment 2—Development Agreement Highlights <br /> 1. The Town and County Managers and staff have crafted and reviewed the draft Development Agreement language <br /> attached. Key negotiated points are as follows: <br /> i. Section III.K — Operating Subsidy. The Managers have a tentative agreement for Carrboro to install a $70,000 <br /> fiber-optic internet and networked communications infrastructure set as well as the ongoing support for this <br /> service in lieu of its cash and in-kind subsidy to the Cybrary. This service is part of a larger infrastructure <br /> investment sponsored by UNC. Should UNC terminate the service, replacement service terms will be negotiated <br /> between the County and Town at that time. Carrboro will be responsible for providing service within this <br /> negotiated framework. <br /> ii. Section IV — Allocation of Project Costs (Land, Site, Off-Site, Vertical Building, and Vertical Parking Structure). <br /> The Managers and staff have discussed the Elements of Value schedule (Exhibit C to the Development Agreement) <br /> to identify these cost sharing elements as either: 1) wholly owned by each Party (ex: interior space upfit); 2) <br /> equally shared; or 3) proportionally shared. These cost allocations are to be finalized by the County and Town no <br /> later than 45 calendar days after schematic design drawings are approved by both Boards. The Managers <br /> tentatively agree as follows: <br /> 1. Land costs:Owned by Carrboro, no contribution required by the County; <br /> 2. Design and permitting costs: Equally shared; <br /> 3. Parking Structure: shared proportionally based upon adequate parking needs as derived and <br /> designed during the design phase of the project. The Managers also agree that the overall parking <br /> design, space assignment, and management plan is to be flexible to support both the Town and <br /> County's needs. Carrboro will provide parking program management and enforcement for the overall <br /> facility; <br /> 4. Site-civil "On Site"and "Off Site(road improvements,etc.): Equally shared; <br /> 5. Shell building foundation, roof,and major functions: Equally shared; <br /> 6. Remaining Shell building components,Common Areas: Proportionally shared; <br /> 7. Interior Upfits: Owned by each Party; <br /> 8. Legal services: Owned by each Party. <br /> 2. Capital Project Planning. Carrboro is placing portions of a $15MM CIP item within its FY2017-18 appropriation for the <br /> 203 Greensboro design costs. Construction costs would be appropriated in FY18-19 and potentially FY19-20. The <br /> County's CIP is structured in a similar fashion where adequate design funds have been appropriated in previous fiscal <br /> years and adequate funds of$6.375MM for the County's portion of the Project's construction costs are contemplated <br /> in FY18-19 and FY19-20. As discussed in paragraph d.ii„the Parties will have 45 days after the formal schematic design <br /> to evaluate more specific cost estimates, negotiate final appropriate cost allocations, and benefit from ongoing value <br /> engineering practices. Should agreement not be reached during this time, each Party has the ability to terminate the <br /> Development Agreement with no recourse other than the absorption of assigned design and related costs up to that <br /> point in time. <br /> 3. On-Site Parking. Adequate parking for the project is contemplated to be provided in some combination of on and off <br /> site facilities. The Agreement provides an understanding that a satisfactory proportion of on-site parking be allocated <br /> to the Orange County Southern Branch Library during normal operating hours. <br /> 4. Friends of the Orange County Southern Branch Library discussions. Discussions with the leadership of the Friends <br /> organization on capital and in-kind service contributions to the Project and its ongoing Library operations. <br />