Browse
Search
Agenda - 10-17-2017 - 6-c - Orange County Southern Branch Library Development Agreement
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 10-17-2017 - Regular Mtg.
>
Agenda - 10-17-2017 - 6-c - Orange County Southern Branch Library Development Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2017 4:00:29 PM
Creation date
10/13/2017 9:59:53 AM
Metadata
Fields
Template:
BOCC
Date
10/17/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6c
Document Relationships
2017-609 AMS - Town of Carrboro - Development Agreement Regarding Southern Branch Library
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
Minutes 10-17-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28 <br /> EXHIBIT C <br /> 203 S.Greensboro Development Agreement <br /> Elements of Value All All Share <br /> Town County Equal I Proportional Notes <br /> Land <br /> 1 Property <br /> 2 Existing environmental remediation.monitoring <br /> Adequate Structured Parking x <br /> Design/Testing/Permitting/Entitlements/Fees <br /> 5 Preliminary vision planning Includes discussions on level of finish.appearance.aesthetics <br /> 6 Zoning/Land Use application fees <br /> 7 Utility/infrastructure analysis fees <br /> 8 Utility/infrastructure impact fees <br /> 9 Designer Fees for Carrboro Planning Process/Approvals <br /> 10 Preliminary site assessment fees Includes geotechnical.environmental.cultural.traffic studies <br /> 11 Sustainability/Energy Modeling and Analysis Fees High performance building standards analysis.cost-benefit analysis <br /> 12 Site/CiviVLandscape design.CA fees.design contingencies <br /> 13 Building Shell.Core Area design.CA fees.design contingencies <br /> 14 Occupant Upfit design.CA fees.Upfit design contingencies x x Occupants pay for upfit costs <br /> Site Topics <br /> 15 De-construction <br /> 16 Clearing.grading.erosion control <br /> 17 Subsurface conditions/unsuitable soils <br /> 18 Site stormwater management system <br /> 13 Retaining well/safety railing If necessary in design <br /> 14 Onsite walkways/specialty surfacing <br /> 16 Temporary staging/stockpiling areas <br /> 17 Building Shell Utility services to identified demarcation points <br /> 18 Utility connection fees If separately metered.per condominium owner <br /> 19 Ste lighting <br /> 20 Shell marquis signage/exterior wayfinding signage <br /> 21 Amenities/site furniture/bike parking <br /> 22 Solid waste/recycling facilities <br /> 23 Bus stop/shelter/site considerations <br /> 24 Sanitary lift station requirements(if necessary) <br /> 25 Site construction contingencies <br /> Off-She Topics <br /> 26 Off-site roadway or pedestrian improvements <br /> 27 Off-site budding shell utility improvements(to property line) <br /> 28 Off-site Bicycle pathway considerations <br /> 29 Off-site construction material staging area costs <br /> Off-site contingencies <br /> Shell,Core&Identified Common Area Construction All main systems to identified demarcations within exclusive occupant <br /> interior spaces. <br /> 30 Foundation System <br /> 31 Roof System.Building drainage leaders/surface drainage piping <br /> 32 Core elevator.shaft and equipment <br /> 33 Core&identified Common Area potable water service/backflow preventer x1 From site demarcation to Core&Common Area facilities <br /> 34 Core&identified Common Area sanitary sewer service <br /> 35 Core&identified Common Area power transformer/service <br /> 36 Core&identified Common Area natural gas service <br /> 37 Core&identified Common Area fire protection shell components <br /> 38 Core&identified Common Area sustainable systems installation <br /> 39 Core&identified Common Area upfit construction <br /> 40 Core&identified Common Area security/access/AV/teledata <br /> 41 Core&identified Common Area furniture.fixtures.and equipment <br /> 42 Shell.Core&identified Common Area contingencies x <br /> Exclusive Condominium Space Interiors Each party bears all costs of exclusive space needs <br /> 43 Upfit branch budding systems Branch systems include electrical.mechanical.plumbing.and fire protection within exclusive areas <br /> 44 Upfit(architectural components) Walls.doors.ceilings.floor covering/treatment.lighting.etc. <br /> 45 Upiitsecuofy/access/AV/teledata <br /> 46 Upfit furniture.fixtures.and equipment <br /> 47 Upfit contingencies x x <br /> Other Costs Each party bears its own costs <br /> 48 Legal Costs <br /> 49 Financing Costs x x <br /> 'proportional hasis for these items is anticipated to he determined in the design phase as building elements and systems are more specifically known,with the put sharing likely to the less than equal ltd moe than on apopaotional square foot0gn 1001.0, <br />
The URL can be used to link to this page
Your browser does not support the video tag.