Browse
Search
Agenda - 10-17-2017 - 4-b - Receipt of SolSmart Silver Level Designation
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 10-17-2017 - Regular Mtg.
>
Agenda - 10-17-2017 - 4-b - Receipt of SolSmart Silver Level Designation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2017 3:39:55 PM
Creation date
10/13/2017 9:59:52 AM
Metadata
Fields
Template:
BOCC
Date
10/17/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4b
Document Relationships
Minutes 10-17-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> SOLS M ART APPLICATION AIMIIV ISMS 11111M16, <br /> PREREQUISITE SUMMARY ",' S Arm as oLJ `y, '%IC -- ) r a <br /> Bronze Requirements Validation Status <br /> PR-1:Solar Statement Done <br /> P-1:Solar Permitting Checklist Done <br /> PZD-1a:Zoning Review Memo Done <br /> 20 points in Permitting Done(40 points achieved) <br /> 20 points in Planning Zoning and Development Review Done(30 points achieved) <br /> 20 points in Special Focus Categories Done(195 points achieved) <br /> Silver Requirements Validation Status <br /> Bronze Designation requirements Done <br /> PZD-2:Allow solar by-right and as an accessory use in all major zones Done <br /> I-1:Provide cross-training of inspection and permitting staff on solar PV Done <br /> 100 points Done(265 points achieved) <br /> Gold Requirements Validation Status <br /> Silver Designation requirements Done <br /> P-2:Provide a streamlined permitting pathway for small PV systems(no more <br /> than 3 days) Incomplete <br /> 200 points Done(265 points achieved) <br /> %of total points available achieved in each category Points achieved %of total available <br /> Permitting 40 31% <br /> Planning/Zoning 30 20% <br /> Inspection 20 25% <br /> Construction - 0% <br /> Solar Rights 10 20% <br /> Utility Engagement - 0% <br /> Community Engagement 85 44% <br /> Market Development&Finance 80 48% <br />
The URL can be used to link to this page
Your browser does not support the video tag.