Browse
Search
2017-542 Planning - Interlocal Agreement between OC, Town of Hillsborough for Construction, Operation of Water, Sewer Facilities in the Hillsborough Area ED
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-542 Planning - Interlocal Agreement between OC, Town of Hillsborough for Construction, Operation of Water, Sewer Facilities in the Hillsborough Area ED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2018 12:04:41 PM
Creation date
10/9/2017 2:10:23 PM
Metadata
Fields
Template:
Contract
Date
9/25/2017
Contract Starting Date
9/25/2017
Contract Ending Date
9/24/2022
Contract Document Type
Agreement - Interlocal
Agenda Item
10/4/17; 6-a
Amount
$0.00
Document Relationships
Agenda - 10-03-2017 - 6-a - Interlocal Agreement Between Orange County and the Town of Hillsborough for Construction and Operation of Water and Sewer in the Hillsborough Area EDD of Orange County
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2017\Agenda - 10-03-2017 - Regular Mtg.
R 2017-542 Planning - Interlocal Agreement between OC, Town of Hillsborough for Construction, Operation of Water, Sewer Facilities in the Hillsborough Area ED
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERLOCAL AGREEMENT BETWEEN ORANGE CO UAW AND THE TOWN OF HILLSBORO UGHFOR CONSTRUCTION.AND <br /> OPERATION OF WATER AND SEWER FACILITIESIN THE HILLSBOROUGH AREA ECONOMICDEVELOPMENT DISTRICT OF <br /> ORANGE COUNTY <br /> properties for up to 5 years after the date of execution of this agreement. The Town of <br /> Hillsborough acknowledges that industrial, office, and commercial uses are intended within <br /> the County EDD and that such uses, if permitted by Orange County (for those projects not <br /> slated for immediate and/or delayed annexation), will be served subject to available capacity <br /> and other factors stated above. <br /> The reservation is made for a period of 5 years and may be extended by written agreement of <br /> the Town for up to an additional 5 years upon written request made to the Town of <br /> Hillsborough prior to expiration of the initial 5 year period. If a Town of Hillsborough utility <br /> agreement uses part of this reservation then the reservation amount is reduced unless <br /> otherwise requested and approved. This agreement is not intended to mandate annexation nor <br /> exclude the potential for the project to remain in the County's planning jurisdiction. If the <br /> project remains in the County's planning jurisdiction, the water and sewer service utility <br /> agreement between the developer and the Town of Hillsborough will be accompanied by a <br /> voluntary annexation agreement to be acted upon when Orange County and the Town of <br /> Hillsborough agree to the timing of such annexation. This would include the preparation and <br /> review of an annexation report prepared for and submitted to the Town of Hillsborough by a <br /> developer. <br /> When development occurs in the jurisdiction as noted in Exhibit A, the land use parameters <br /> noted within the Orange County/Town of Hillsborough joint land use plan will act as guidance <br /> to zoning. <br /> 5. Construction Standards. In all respects, except to the extent otherwise stated in this agreement, <br /> the construction will be done in accordance with (i) Hillsborough utility standards, <br /> requirements, specifications, and procedures, including approvals of plans and permits, <br /> conducting inspections, requiring tests and certifications, and requiring record (as-built) <br /> drawings, and (ii) any applicable federal and state standards. Notwithstanding any other part <br /> or provision of this agreement should any such approvals or permits be withheld or <br /> unobtainable, this agreement may be terminated by Orange County, at no cost and with no <br /> further liability or obligation to Orange County, upon written notice to the Town of <br /> Hillsborough. In the event of such termination, the County and the Town shall each be <br /> responsible for the respective costs they incurred pursuant to this agreement up until the time of <br /> termination. <br />
The URL can be used to link to this page
Your browser does not support the video tag.