Browse
Search
2017-540-E AMS - Triangle Landscaping, Inc. to construct six concrete pads
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-540-E AMS - Triangle Landscaping, Inc. to construct six concrete pads
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2018 12:02:34 PM
Creation date
10/2/2017 3:48:37 PM
Metadata
Fields
Template:
Contract
Date
9/20/2017
Contract Starting Date
9/20/2017
Contract Ending Date
11/30/2017
Contract Document Type
Agreement - Construction
Agenda Item
6/6/17
Amount
$10,525.00
Document Relationships
R 2017-540-E AMS - Triangle Landscaping, Inc. to construct six concrete pads
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A2549449-B787-4CD2-9735-486D2801231C <br /> Triangle Landscaping Inc. Estimate <br /> PO Box 144 <br /> Stem, NC 27581 Date Estimate# <br /> 9/14/2017 355 <br /> Name/Address <br /> Orange County Asset Management Services <br /> 131 West Margaret Lane <br /> Hillsborough,NC 27278 <br /> Project <br /> Description Qty Cost Total <br /> Generator Pads for Six different buildings. <br /> Cedar Grove:Pad size 9.75 Ft long and 5.5 Ft wide Concrete 6" 1,125.00 1,125.00 <br /> thick#8 Wire Mesh,Concrete 3000 PSI.. <br /> Animal Services:Pad size 13.5 Ft long and 7Ft wide.#5 rebar will 3,500.00 3,500.00 <br /> be drilled into existing concrete to keep new pad from shifting.#8 <br /> Wire Mesh, This concrete will be 12"thick 3000 PSI.Four Ballards <br /> also need to be installed 6"pipe filled with concrete and painted. <br /> Concrete back electrician ditch.Cut two existing Ballards off as <br /> flush to concrete as possible and fill. <br /> Efland Community Center:Pad size 8.5 Ft long and 5.5 Ft wide 1,500.00 1,500.00 <br /> concrete 6"thick 3000 PSI#8 Wire Mesh,gravel needed to level <br /> pad and possible Georgia buggy needed <br /> Hillsborough Comm.:Pad size 13.5 long and 7Ft wide 3000 PSI 1,600.00 1,600.00 <br /> concrete,Concrete 12"thick,#8 Wire Mesh, Fence needs to be <br /> taken down,Georgia Buggy will be needed <br /> Passmore:Pad size 13.5 Ft long and 6.5 Ft wide Concrete 12" 1,300.00 1,300.00 <br /> Thick,#8 Wire Mesh <br /> Rena:Pad size 8.5 Ft long and 5.5 Ft wide 3000 PSI,Concrete 6" 1,500.00 1,500.00 <br /> thick,#8 Wire Mesh Gravel needed to level pad,Georgia buggy <br /> needed <br /> Total $10,525.00 <br /> Customer Signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.