Browse
Search
2017-526-E ES - Gonzalez Painters & Contractors, Inc. for painting services at Emergency Operations Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-526-E ES - Gonzalez Painters & Contractors, Inc. for painting services at Emergency Operations Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2018 11:42:03 AM
Creation date
9/29/2017 11:04:26 AM
Metadata
Fields
Template:
Contract
Date
9/22/2017
Contract Starting Date
9/22/2017
Contract Ending Date
9/30/2017
Contract Document Type
Agreement - Construction
Amount
$3,000.00
Document Relationships
R 2017-526-E ES - Gonzalez Painters & Contractors, Inc. for painting services at Emergency Operations Center
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:897E46E3-FA01-48C0-AD59-05BF8E64A105 <br /> GONZALEZ PAINTERS & F Inters a CDntrccfors, INC <br /> CONTRACTORS, INC <br /> 4301 Bennett Memorial Rd <br /> Durham NC 27705 <br /> ESTI MATE <br /> 919-477-6058 <br /> Bill to: Date: Estimate#: <br /> 18804 <br /> Angel Barnes <br /> Asset Management Services <br /> 919-201-6829 <br /> Description: Amount: <br /> INSURANCE.... .... .... .... .... .... .... .... .... .... <br /> -Liability insurance and worker's compensation are carried through CMA Insurance,certificate of insurance is <br /> available upon request <br /> LIMITED WARRANTY <br /> -Gonzalez Painters and contractors,INC hereby guarantees that all work executed under this contract will be <br /> free of defects in materials and workmanship for a period of one(1)years from the date of final acceptance.All <br /> defects occurring within that period shall be replaced or repaired at no cost to the owner. This warranty is in lieu <br /> of all other warranties,expressed or implied.Our responsibility is limited to correct the condition as indicated <br /> above. <br /> -This warranty excludes and in no event will Gonzalez Painters and contractors,INC be responsible for <br /> consequential or incidental damages caused by accident or abuse,temperature changes,settlement or moisture, <br /> i.e.cracks caused by expansion and/or contraction.Cracks will be properly prepared as indicated at time of job, <br /> but will not be covered under this warranty. <br /> WORK STANDARD <br /> -All work is to be completed in a manner according to standard practices.Worker(s)will remain on job <br /> premised until completion of project.Work site will be cleaned daily and upon project completion.All <br /> agreements are contingent upon strikes,accidents,or delayed beyond our control. <br /> -The painting contractor will produce a"properly painted surface".A"properly painted surface is one that is <br /> uniform in color and sheen.It is one that is free of foreign material,lumps,skin sags,holidays,misses, <br /> strike-through,or insufficient coverage.It is a surface that is free of drips,splatters,spills,or over-spray which <br /> the contractors'workforce causes.Compliance to meeting the criteria of the"properly painted surface"shall be <br /> determined when viewing without magnification at a distance of five feet or more under normal lighting <br /> conditions and from a normal viewing position. <br /> -Any prior drips or poor workmanship prior to this painting may or may not be able to be corrected and will be <br /> determined at the time of the estimate. <br /> CUSTOMER RESPONSIBILITY <br /> -Please take specific note of job description <br /> -Color must be chosen one(1)week prior to start date.An Additional cost will be charged for color changes <br /> made after the commencement of work. <br /> -Alarms must be turned off while work is in progress <br /> Thank you for the opportunity to quote your job Total <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.