Browse
Search
Agenda - 05-04-2006-5f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 05-04-2006
>
Agenda - 05-04-2006-5f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:38:42 PM
Creation date
8/29/2008 9:23:50 AM
Metadata
Fields
Template:
BOCC
Date
5/4/2006
Document Type
Agenda
Agenda Item
5f
Document Relationships
Minutes - 20060504
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Mary Bradshaw Page 2 of 12 ~ <br />Address: 2712 Mill Creels Road <br />City: Mebane <br />Phone #: 563-0958 <br />Date: <br />h MAJOR SYSTEMS <br />A. SUB-AREA CLEANUP & TERMITE REPORT/TREATMENT <br />1, Chemically treat entire perimeter of house for termite and pest control. <br />Chemical treatment to be done by a licensed termite or pest control <br />company. Conhactor to provide owner with written proof and warranty of <br />treatment. <br />2. Supply and install 6 mil plastic vapor barrier to entire sub-area of house so <br />as to provide moisture protection, <br />B, FOUNDATION <br />1. Repair one foundation vent in rear foundation wall to restore to proper <br />working order.. <br />2. Remove wood sill from existing crawlspace access door. Supply and <br />install new heated wood sill under existing access door and new locking <br />hasp with lock to restore to proper woxlcing order. NOTE: If further <br />damage is discovered after existing sill is removed, the Owner; Contractor <br />and Rehabilitation Specialist will meet to review the work, determine a <br />course of action and, if necessary, a cost for any additional work. <br /> <br />C ROOF & GUTTER <br />1. Remove existing composition shingle roof cover to sheathing. Does not <br />include rake trim, fascia and soffit (See Lead Remediation Specs). NOTE: <br />After existing roof cover is removed, if further damage is discovered the <br />Owner, Contractor and Rehabilitation Specialist will meet to review the <br />work, determine a course of action and, if necessary, a cost for any <br />additional work. Replace flashing including all chimney flashing, roof <br />jacks, metal nosing, plumbing boots, metal drip edge, etc.. Paint all vents, <br />
The URL can be used to link to this page
Your browser does not support the video tag.