Browse
Search
Agenda - 05-04-2006-5f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 05-04-2006
>
Agenda - 05-04-2006-5f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:38:42 PM
Creation date
8/29/2008 9:23:50 AM
Metadata
Fields
Template:
BOCC
Date
5/4/2006
Document Type
Agenda
Agenda Item
5f
Document Relationships
Minutes - 20060504
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Sheri Moore Page 10 of 14 3 ~ <br />Address: 8516 Union Grove Church Road <br />City: Chapel Hill <br />Phone #: 933-4087 <br />Date: <br />1.2. In Ha11, remove, existing disappearing attic access stairs, Repau existing <br />framing to accommodate installation of new unit. Supply and install new <br />disappearing attic access stair unit, similar to existing, including all <br />necessary trim, complete, <br />13, Supply and install new address numbers on exterior of house near front <br />door. <br />I. SUB-AREA CLEANUP & TERMITE REPORT/TREATMENT <br />1. Provide pest control inspection report and chemically treat enfire <br />perimeter of house for termite and pest control. Chemical treatrnent to be <br />done by a licensed termite or pest control company. Contractor to provide <br />owner with written proof and warranty of treatment. <br />K. STI'E IMPROVEMENTS <br />1. Tn front yazd at left corner of house, trim existing shrub away from house, <br />2. Remove two dump truck loads of owner-designated articles and debris <br />from exterior grounds of property, <br />IL. KITCHEN <br />1. Prepaze existing Kitchen floor for installation of new luaun plywood <br />underlayment, Supply and install new %a" luaun underlayment with a <br />smooth top surface, and prepare for installation of new vinyl floor cover, <br />Supply and install new vinyl floor cover per Owner selection, Includes <br />new baseboard and shoe mold, caullcing all seams at baseboazd and shoe <br />mold, new metal transition strips, complete, All new materials to match <br />existing as close as practical. <br />
The URL can be used to link to this page
Your browser does not support the video tag.