Browse
Search
Agenda - 05-04-2006-5f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 05-04-2006
>
Agenda - 05-04-2006-5f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:38:42 PM
Creation date
8/29/2008 9:23:50 AM
Metadata
Fields
Template:
BOCC
Date
5/4/2006
Document Type
Agenda
Agenda Item
5f
Document Relationships
Minutes - 20060504
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Sheri Moore Page 8 of 14 35 <br />Address: 8516 Union Grove Church Road <br />City: Chapel Hill <br />Phone #: 933-4087 <br />Date: <br />3. Remove approximately 4 l..f. of damaged trim and fascia on left front <br />comer of house, NOTE: After trim and fascia materials aze removed, if <br />further damage is discovered the Owner, Contractor and Rehabilitation <br />Specialist will meet to review the work, determine a course of action and, <br />if necessazy, a cost for any additional work. Supply and install new fascia <br />and trim to restore to proper working order, New materials to be primed <br />on all sides. New materials and finishes to match existing as close as <br />practical. <br />4, Remove approximately 4 hf of damaged trim and fascia on left rear <br />comer of house. NOTE: After trim and fascia materials are removed, if <br />further damage is discovered the Owner, Contractor and Rehabilitation <br />Specialist will meet to review the work, determine a course of action and, <br />if necessazy, a cost for any additional work. Supply and install new fascia <br />and trim to restore to proper working order. New materials to be primed <br />on all sides. New materials and finishes to match existing as close as <br />practical, <br />5, Remove approximately 8 hf, of damaged fascia on rear of house, NOTE: <br />After fascia materials are removed, if further damage is discovered the <br />Owner, Contractor and Rehabilitation Specialist will meet to review the <br />work, determine a course of action and, if necessazy, a cost for any <br />additional work, Supply and install new fascia to restore to proper <br />working order. New materials to be primed on all sides. New materials <br />and finishes to match existing as close as practical, <br />6. Supply and install new pre-finished white aluminum coil stock over all <br />rake trim, eaves, and fascia on house and porches. Includes side panels of <br />porches. Materials, style and color to match existing as close as practical. <br />Conttactor to supply owner with written warranty for materials and labor, <br /> <br />7.. Remove two (2) existing gable vents and prepare areas for installation of <br />new vents, Supply and install new pre-finished vinyl gable vents at same <br />locations, Supply and install new plywood substrate over existing siding <br />to support new vinyl siding. Supply and install new white vinyl siding <br />
The URL can be used to link to this page
Your browser does not support the video tag.