Browse
Search
Agenda - 05-04-2006-5f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 05-04-2006
>
Agenda - 05-04-2006-5f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:38:42 PM
Creation date
8/29/2008 9:23:50 AM
Metadata
Fields
Template:
BOCC
Date
5/4/2006
Document Type
Agenda
Agenda Item
5f
Document Relationships
Minutes - 20060504
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Sheri Moore Page 7 of 14 34 <br />Address: 8516 Llnion Grove Church Road <br />City: Chapel Hill <br />Phone #: 933-4087 <br />Date: <br />G. INSULATION & WEATHERIZATION <br />1, Supply and install blown-in insulation of R-30 value to entire attic, <br />complete. <br />H. INTERIOR PAINTING <br />1. Fully prepare all interior ceiling, wall, door and trim surfaces to receive <br />new paint. Includes prime new crown molding, prime new sheetrock, and <br />prime any new or "raw" materials. Paint crown molding, trim, door <br />casing and doors with interior semi-gloss latex enameh Paint Kitchen and <br />Bathroom walls and ceilings with interior semi-gloss latex enamel. Paint <br />all other walls and ceilings with interior flat latex. Restore all surfaces to <br />proper working order, Finish paint shall provide sufficient coverage to <br />prevent previous colors from showing through. Color to match existing as <br />close as practicah Protect glass, floor covering, vegetation and personal <br />possessions with appropriate temporazy coverings and enclosures. <br />I. GENERAL REPAIl2S <br />1. Remove existing block chimney to below roof line and properly cap-off <br />remaining top.. Supply and install replacement roof sheathing to <br />accommodate installation of new roof cover, New materials to match <br />existing as close as is practical. <br />2. Remove approximately 74 Lf. of soffit from front and rear of house. <br />NOTE: After soffit materials aze removed, if further damage is discovered <br />the Owner, Contractor and Rehabilitation Specialist will meet to review <br />the work, determine a course of action and, if necessary, a cost for any <br />additional work, Prepaze soffit areas for installation of new vinyl vented <br />soffit, Supply and install new vinyl vented soffit and to restore to proper <br />working order. New materials and finishes to match existing as close as <br />practical, <br />
The URL can be used to link to this page
Your browser does not support the video tag.