Browse
Search
Agenda - 05-04-2006-5f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 05-04-2006
>
Agenda - 05-04-2006-5f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:38:42 PM
Creation date
8/29/2008 9:23:50 AM
Metadata
Fields
Template:
BOCC
Date
5/4/2006
Document Type
Agenda
Agenda Item
5f
Document Relationships
Minutes - 20060504
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Sheri Moore Page 5 of 14 <br />Address: 8516 Union Grove Church Road 3 2 <br />City: Chapel Hill <br />Phone #: 933-4087 <br />Date: <br />2, Separate and add circuits to alleviate overloaded circuits on electrical <br />system. HVAC,~stove, water heater, washing machine and microwave to <br />be each on separate circuits, <br />3. Remove existing outlets throughout interior of house. Supply and install <br />new outlets at same locations, complete. <br />4, Remove existing switches throughout interior of house, Supply and install <br />new outlets at same locations, complete, <br />5. Supply and install new GFI outlet in Bathroom. $ <br />6, Supply and install two (2) new GFI outlets in Kitchen, $ <br />7.. Supply and install arc fault interrupter circuits nn Bedroom circuits. $. <br />8. Supply and instal] new electrical to accommodate installation of new <br />"direct-wired" smoke detectors in Hall and each Bedroom. Supply and <br />install new "direct-wire" smoke detectors, complete. <br />9. Supply and install new electrical in attic to accommodate one new light <br />fixture adjacent to attic access, including ane switch control located in <br />crawlspace within 3 l.f, of access door. and supply and install fixtures, <br />complete. <br />10. Supply and install new electrical in attic to accommodate installation of <br />new HVAC system, complete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.