Browse
Search
Agenda - 05-04-2006-5f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 05-04-2006
>
Agenda - 05-04-2006-5f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:38:42 PM
Creation date
8/29/2008 9:23:50 AM
Metadata
Fields
Template:
BOCC
Date
5/4/2006
Document Type
Agenda
Agenda Item
5f
Document Relationships
Minutes - 20060504
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Sheri Moore Page 4 of 14 3 ~ <br />Address: 8516 iJnion Grove Church Road <br />City: Chapel Hill <br />Phone #: 933-4087 <br />Date: <br />4. In Kitchen, remove existing cold water line from sink to entry to Kitchen. <br />Supply and install new materials to restore cold water line to proper <br />working order. New materials to match existing as close as practical.. <br />Worlc shall be performed in an efficient, workmanlike manner so as to <br />keep "down time" and temporary connections to a minimum, All work to <br />code. <br />5, Remove existing I{itchen sink, faucet, p-trap assembly, supply lines and <br />shut-off valves, Supply and install new shut-off valves, p-trap assemble, <br />double bowl stainless steel sink, and single-handle control faucet, <br />complete. Work shall be performed in an efficient, wotkmanlike manner <br />so as to keep "dawn time" and temporary connections to a minimum. All <br />work to code. <br />6. Run "snake" through Kitchen and Bathroom drain lines to clear lines and <br />provide proper drain flow to septic system. <br />7. Re-attach and secure existing plumbing vent pipe on reaz exterior wall. <br />Extend all existing plumbing vents to above the roof to provide proper <br />ventilation. <br />D, ELECTRICAL <br />1, Properly disconnect and abandon existing electrical service, Supply and <br />install new 200 A.Mi' electrical service to house including new breaker <br />panel, mast, weatherhead, and grounding, complete. Work shall be <br />performed in an efficient, worlcrnanlike manner so as to keep "down time" <br />and temporary connectons to a minimum, Includes new circuits, breakers <br />and proper grounding, complete. Circuits and breakers to be clearly <br />identified. Newly installed junction boxes in attic and underfloor shall be <br />located so they are not covered by insulation. All work to code. <br />
The URL can be used to link to this page
Your browser does not support the video tag.