Orange County NC Website
Name: Sheri Nloore Page 3 of 14 30 <br />Address: 8516 Union Grove Church Road <br />City: Chapel Hill <br />Phone #: 933-4087 <br />Date: <br />flashing, roof jacks, metal nosing, plumbing boots, metal drip edge, etc.:.. <br />All metal edge flashing, nosing and drip edge to be pre-finished white <br />material. Supply and install new 25 yeaz (minimum) composition shingle <br />roof cover over 15# felt on house, front porch and side porch, complete, <br />Includes shingle-type ridge ventilation system, Seal all penetrations <br />through roof with waterproof material. Shingles at porch roofs to have 4" <br />reveah Style and color to match existing as close as practical. Contractor <br />to supply owner with written warranty for materials and labor. New <br />materials to match existing as close as practicah All work to code. <br />2, Supply and install new white pre-painted galvanized metal drip edge <br />fleshings, new white pre-painted seamless Ogee style gutters on house, <br />porch and cazport with at least one downspout far each gutter and one <br />downspout for every 30' of gutter. Color to match existing as close as <br />practical. Each grade level downspout from house shall have a <br />splashblock directing water away from the house. <br />C. PLUMBING <br />1, In crawlspace where existing sewer line is leaking under Bathroom, clear <br />effluent from azea. Repair existing leaking sewer line to restore to proper <br />worlring order. Materials to match existing as close as is practical. Work <br />shall be performed in an efficient, worlananlike manner so as to keep <br />"down time" and temporazy connections to a minimum. All work to code, <br />2. In Kitchen, remove existing water heater. Supply and install new <br />insulated "table top" 40 gallon water heater at same location, including <br />P/T valve, overflow pipe to exterior, complete, Work shall be performed <br />in an efficient, workmanlike manner so as to keep "down time" and <br />temporary connections to a minimum. All work to code. <br />3. In Kitchen, repair existing hot water line that is leaking inside of the sink <br />cabinet. New materials to match existing as close as practical. Work shall <br />be performed in an efficient, workmanlike manner so as to keep "down <br />time" and temporary connections to a minimum, All work to code. <br />