Browse
Search
Agenda - 05-04-2006-5f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 05-04-2006
>
Agenda - 05-04-2006-5f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:38:42 PM
Creation date
8/29/2008 9:23:50 AM
Metadata
Fields
Template:
BOCC
Date
5/4/2006
Document Type
Agenda
Agenda Item
5f
Document Relationships
Minutes - 20060504
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Mary Bradshaw <br />Address: 2712 Mill Creels Road <br />City: Mebaz7e <br />Phone #: 563-0958 <br />Date: <br />Page 10 of 12 15 <br />5. Remove existing angle stop, shutoff valve, escutcheon ring, and anchor <br />bolts for toilet. Supply and install new angle stop, shutoff valve, <br />escutcheon ring, riser, and anchor bolts to restore to proper working order. <br />Reinstall existing toilet at same location, complete. <br />6 Remove existing angle stop, shutoff valve, escutcheon ring, riser and <br />faucet for sink. Supply and install new angle stop, shutoff valve, <br />escutcheon ring, riser and faucet for sink to restore to proper working <br />order. Reinstall existing vanity and sink at sarne location, complete. <br /> <br />7. Remove existing interior door, frame, ,jamb and trim. Supply and install <br />new door, frame, junb and trim to match existing as close as is practical, <br />including hardware and doorknob, complete. New materials to match <br />existing as close as is practical. <br />8. Fully prepare painted sm~faces, including walls, ceiling and trim, ready to <br />receive new paint. Includes patch and repair of sheet-rock holes and <br />surface cracks. Paint walls, ceilings and trim with interior latex enamel <br />semi-gloss finish paint and restore to proper working order. New <br />materials to match existing as close as practical. <br />9. Supply and install new grab bars in tub/shower and at toilet properly <br />anchored in solid substrate. Locations to be designated by owner as close <br />as proper anchoring will allow, <br />IV, BEDROOM #1 (Left, front corner) <br />1. Remove existing interior door, franle, jamb and trim. Supply and install <br />new door, frame, jamb and trim to match existing as close as is practical, <br />including hardware and doorknob, complete. New materials to match <br />existing as close as is practical. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.