Browse
Search
Agenda - 05-04-2006-5f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 05-04-2006
>
Agenda - 05-04-2006-5f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:38:42 PM
Creation date
8/29/2008 9:23:50 AM
Metadata
Fields
Template:
BOCC
Date
5/4/2006
Document Type
Agenda
Agenda Item
5f
Document Relationships
Minutes - 20060504
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name; Mary Bradshaw <br />Address: 3712 Mill Creek Road <br />City: Mebane <br />Phone #: 563-0955 <br />Date: <br />Page 3 of 12 ~ 3 <br />2. Remove approximately four (4) existing loose brick and loose mortar on <br />rear steps and landing. Supply and install approximately fifteen (15) new <br />brick, new mortar where existing was removed, and new mortar where <br />materials were missing. Restore steps and landing to proper working <br />order. New materials and finishes to match existing as close as practical. <br /> <br />3, Supply and install new wood railing and handrail of 2 x 4 treated material <br />on front steps and landing. New materials and finishes to match existing <br />as close as practicah All work to code. <br />4 At rear porch, make corrections to existing railing to meet code, complete. <br />New materials and finishes to match existing as close as practicah <br /> <br />5, Where existing heating unit was removed in Hall, repair floor, wall and <br />ceiling to match existing as close as practical. <br />6. Supply and install new address numbers on exterior of house neaz- front <br />door.. <br />K, SITE IMPROVEMENTS <br />Properly prepare existing concrete landing at bottom of rear steps for <br />installation of new concrete topping slab. Supply and install new concrete <br />topping slab of equal length and width of existing slab, to fill to top of <br />existing first brick step and slope uniformly away from existing steps and <br />house to provide proper drainage. Includes broom finish to provide slip- <br />resistant surface. <br />
The URL can be used to link to this page
Your browser does not support the video tag.