Browse
Search
Agenda - 05-04-2006-5f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 05-04-2006
>
Agenda - 05-04-2006-5f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:38:42 PM
Creation date
8/29/2008 9:23:50 AM
Metadata
Fields
Template:
BOCC
Date
5/4/2006
Document Type
Agenda
Agenda Item
5f
Document Relationships
Minutes - 20060504
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Mary Bradshaw Page 6 of 12 ~ i <br />Address: 2712 Mill Creels Road <br />City: Mebane <br />Phone #: 563-0958 <br />Date: <br />21. Remove existing ceiling light fixture in Bedroom #1 (left, front corner). <br />Supply and install new ceiling light fixture at same location, complete. <br /> <br />22. Remove existing ceiling light fixture in Bedroom #2 (left, rear corner). <br />Supply and install new ceiling light fixture at same location, complete. <br /> <br />23. Remove existing ceiling light fixtwe in Bedroom #3 (left, center). Supply <br />and install new ceiling light fixture at same location, complete. <br /> <br />24, Remove existing ceiling light fixture in Hall.. Supply and install new <br />eeilurg light fixture at same location, complete. <br />F. MECHANICAL <br />L Properly disconnect supply and service lines to two existing heating <br />systems; one in the crawlspace, and one in the Hall. Remove two existing <br />heating systems, including abandoned ducting in crawlspace, Make <br />adjustments to existing concrete block piers, to existing gas supply line, <br />and to existing floor openings to accommodate installation of new split <br />system propane gas pack HVAC system.. Includes provide new opening in <br />Batlu-oom floor to accommodate installation of new insulated flexible <br />ducting. Supply and install new split system propane gas pack HVAC <br />system, with minimum 12 SEER, including insulated flexible ducting to <br />all rooms and all necessary service and supply lines, complete. Includes <br />thermostat control located at appropriate location on wall in Hall. <br />Includes concrete pad for condenser unit.. Worlc shall be performed in an <br />efficient, workmanlike manner so as to keep "down time" and temporary <br />coimections to a minimum. <br />
The URL can be used to link to this page
Your browser does not support the video tag.