Browse
Search
2017-509-E SW - Porter Scales for installation of new truck scale
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-509-E SW - Porter Scales for installation of new truck scale
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2018 11:42:40 AM
Creation date
9/27/2017 9:09:28 AM
Metadata
Fields
Template:
Contract
Date
9/11/2017
Contract Starting Date
9/11/2017
Contract Ending Date
11/30/2017
Contract Document Type
Agreement - Services
Amount
$69,310.00
Document Relationships
R 2017-509-E SW - Porter Scales for installation of new truck scale
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:011AC816-5686-4AAD-8FCF-2F8148EDBCC8 <br /> PORTER SCALES Page 2 of 3 <br /> June 22, 2017 <br /> Qty. (1) 10m (32ft) PDX Home run cable, p/n 61044730 $ 210.00 <br /> (animal deterrent stainless steel sheathed cable) <br /> Qty. (1) Matko,4"Scoreboard $ 1,318.00 <br /> Features: <br /> • Part #: SBL-4A-U <br /> • Characters: 4" High <br /> • Annunciators: 1.5"High <br /> Qty. (1) Freight, crane, setting modules, anchoring base plates $ 5,013.00 <br /> Qty. (1) Start-up (wiring, programming and calibration to HB44 standards) $ 1,440.00 <br /> Scale cost(excluding options) $41,802.00 <br /> Foundation: $ 24,150.00 <br /> Scope of Work: <br /> Provide labor, equipment, and materials to install a 70'x 11'above-ground shallow <br /> pier scale foundation with 2- 10'flat approaches, 2- 25' ramps and wash out slabs. <br /> Coping angle and bumper plates provided. <br /> NOTE: Price based on a flat and level gravel or dirt site, clear of all underground utilities, <br /> rock, unsuitable soils or other obstructions. <br /> Exceptions&Qualifications: <br /> • Foundation requires 2500 PSF rated soil <br /> • All spoils left on site <br /> • If problem occurs during foundation construction such as rock, <br /> unsuitable soils or other obstructions an additional charge will be <br /> added to the invoice. <br /> • Porter Scales and Sterling Contracting, Inc. are not responsible for <br /> damage to underground utilities <br /> Customer is responsible for: <br /> • Any permits (if needed) F� <br /> • All conduit runs (scale to indicator & indicator to scoreboard) <br /> • Mounting of Scoreboard <br /> • Power for Indicator&Scoreboard <br /> PO BOX 27905-27611 LOCAL 919-828-1750 <br /> 1721 LAKE WHEELER ROAD FACSIMILE 919-755-0991 <br /> RALEIGH,NC 27603 TOLL FREE 800 451-9438 <br />
The URL can be used to link to this page
Your browser does not support the video tag.