Browse
Search
Agenda - 04-25-2006-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 04-25-2006
>
Agenda - 04-25-2006-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 8:53:29 AM
Creation date
8/29/2008 9:22:18 AM
Metadata
Fields
Template:
BOCC
Date
4/25/2006
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 20060425
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.6 Local Materials <br />• Specify that a minimum of 20% of building and site materials are manufactured regionally within a 500 mile radius <br />5.9 Durable <br />• Review materials used in the building for durability to ensure appropriate life cycle costs for roofs, HVAC, structure systems, finishes, <br />furniture, fixtures and equipment <br />Indoor Environnnent <br />61 Minimum Indoor Air <br />• Meet the minimum requirements of standard ASHRAE 62 -1999, Ventilation for Acceptable Indoor Air <br />• Explore installation of CO monitoring systems if called for <br />6.2 Tobacco Smoke <br />• All guidelines met <br />6.3 CO2 Monitor fng <br />• Install a permanent CO2 monitoring system with a concentration towards high occupancy areas with parameters set at no more than 530 <br />parts per million when compared to outside air or 1,000 parts per million for indoor air <br />6.4 Ventilation Effectiveness <br />• For mechanically ventilated buildings, design systems that result in air exchange effectiveness greater than 0.9 as determined by <br />ASFIRAE 129 -1997 <br />• In building renovations, continue the same exchange effectiveness <br />6.5 Construction IAQ <br />• During construction, meet SMACNA IAQ guidelines and protect stored on -site or installed absorptive materials from moisture <br />• Replace air filters regularly to maintain system cleanliness during construction and just before occupancy <br />• Flush the building with 100% filtered and conditioned air for a period of not less than 30 days prior to occupancy as schedule <br />6.6 Low - emitting Materials <br />• Meet or exceed VOC limits for adhesives, sealants, paints, carpets and composite wood products using the following <br />• South Coast Air Quality Management Rule <br />• Bay Area Air Resources, Reg 8 Rule <br />• Green Seal <br />• Carpet and Rug Institute Green Label program <br />6.7 Indoor Chemical and <br />• Design to minimize cross contamination of regularly occupied areas by using grates and grills for dirt and <br />• Separate outside exhausts so that no air recirculation occurs from custodial, laboratory or copying /printing rooms take <br />• Provide appropriate drainage systems for liquid <br />• hnplement and insure good housekeeping processes within the building <br />6,8 System Control <br />• Provide one operable window and one lighting control panel per 200 square feet for all occupied <br />• Provide controls for individual airflow, temperature and lighting for regularly occupied areas to teachers and staff within accepted <br />parameters <br />
The URL can be used to link to this page
Your browser does not support the video tag.