Browse
Search
2017-418-E Planning - Wellsmont Landscaping to mow and clear Efland Sewer System
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-418-E Planning - Wellsmont Landscaping to mow and clear Efland Sewer System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 10:58:38 AM
Creation date
9/11/2017 12:24:56 PM
Metadata
Fields
Template:
Contract
Date
8/23/2017
Contract Starting Date
8/23/2017
Contract Ending Date
2/28/2017
Contract Document Type
Contract
Amount
$3,480.00
Document Relationships
R 2017-418-E Planning - Wellsmont Landscaping to mow and clear Efland Sewer System
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:F4AB36D7-6659-49D9-816A-AC4ABC1AF4D6 <br /> EXHIBIT A <br /> Project Specifications for Sewer Line Easement Clearing <br /> In addition to mowing the ground cover, the Contractor will remove any limbs or <br /> other vegetative growth that projects into the easement area, up to a height of 10 feet. <br /> There may also be trees or limbs that have fallen across the easement. These will <br /> need to be cut to the limits described and either hauled away or chipped in the <br /> field as described above. <br /> There are some manholes that are enclosed within fenced-in yards or may <br /> otherwise be inaccessible, due to structures built by property owners around the <br /> easements. To the greatest extent possible, the Orange County Engineering staff <br /> will advise the Contractor of any known structures that might impede clearing before <br /> work begins. However, if the Contractor comes across an area that would require <br /> destruction of such fences or other structures in order to clear the easement, the <br /> Contractor should contact Orange County Engineering Staff for guidance, prior to <br /> taking any further action. <br /> Exclusions <br /> 1. The grounds within the fence lines of the Richmond Hills Pump Station and the <br /> Brookhollow Pump Station. <br /> Schedule <br /> Once notified to begin work, please note that time is of the essence. Work on <br /> this project should commence as soon as possible and continue without interruption <br /> until the project is completed. Should there be delays, for whatever reason, the work <br /> shall be completed no later than the termination date of contract. <br /> S:\12_Engineering\Efland Sewer\Contracts\Easement Clearing\FY2016-2017\SewerLineEsmtClearingSpecifications_2016.docx <br /> Specifications Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.