Browse
Search
2017-407-E AMS - Tile Restoration Inc. for restrooms, kitchen, housekeeping closet at 129 E. King St.
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-407-E AMS - Tile Restoration Inc. for restrooms, kitchen, housekeeping closet at 129 E. King St.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 11:49:19 AM
Creation date
9/8/2017 4:14:54 PM
Metadata
Fields
Template:
Contract
Date
8/30/2017
Contract Starting Date
9/1/2017
Contract Ending Date
10/31/2017
Contract Document Type
Contract
Amount
$2,480.88
Document Relationships
R 2017-407-E AMS - Tile Restoration Inc. for restrooms, kitchen, housekeeping closet at 129 E. King St.
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: FCA0E1BB-47B7-480B-A920-86DA50EE65BC <br /> t <br /> r/ <br /> VI E Your Flooring x� �, r-' <br /> Solution Resource <br /> Tile Restoration Inc <br /> 119 East Main St, <br /> Hookerton,North Carolina 28538 <br /> Phone: 2527472821 Fax 252-376-1452 <br /> Freddy Brooks Date: 08/19/2017 10:37 AM <br /> Orange County Public Works Phone:919-245-2636 Fax:919-644-3043 Rep.: Brad Albritton <br /> 600 Highway 86 North Email:fbrooks @orangecountync.gov Cell :252-916-2045 <br /> Hillsborough, NC 27278 Email: brada @tilerestorationinc.com <br /> Units r Process Description of Area Price Per Price <br /> 1 150 GroutGLAZE GroutGLAZE Process Includes:Labor and Materials Men's $900.00 $900.00 <br /> and Women's Restrooms <br /> -Removal of Contamination from tile and grout surface <br /> -Prep to grout lines for restoration <br /> -Application of Non Porous Resin <br /> 1 150 GroutGLAZE GroutGLAZE Process Includes:Labor and Materials $ 1,175.00 $ 1,175.00 <br /> Kitchen Floor and Housekeeping Closet <br /> -Removal of Contamination from tile and grout surface <br /> -Prep to grout lines for restoration <br /> -Application of Non Porous Resin <br /> 1 150 GroutGLAZE GroutGLAZE Process Includes:Labor and Materials Unisex $ 150.00 $ 150.00 <br /> Rest room <br /> -Removal of Contamination from tile and grout surface <br /> -Prep to grout lines for restoration <br /> -Application of Non Porous Resin <br /> Public Defender's Office - Restrooms and Kitchen Tile <br /> 1 <br /> I <br /> 50%of Proposal Due Before Work is Scheduled Deposit Due <br /> A fee of 2.5%will be added for all all Credit Card transactions SUT $255.88 <br /> Terms:Net 20 Days Total $2,480.88 <br /> Please Remit All Contracts,PO's and Payments To: <br /> Tile Restoration Inc.119 East Main St PO Box 160 Hookerton NC 28538 <br /> Proposal Valid for 30 Days Delivery to Job,Sales Tax and Installation are included. <br /> All services guaranteed as specified.All work to be complete in a workmanlike manner according to standard practices.Any alteration or deviation fiom this proposal involving extra costs will be <br /> executed only upon written orders,and will become an extra charge over and above the proposal.All agreements contingent upon strikes,accidents or delays beyond our control.Owner to carry fire, <br /> tornado and other <br /> necessary insurance.Our workers are filly covered by Workman's Compensation Insurance.Evidence of Insurance will be provided upon request.Any special requirements or endorsements may <br /> incur additional charges.We do not waive any rights of subrogation against contractor or owner for any loss covered by insurance of any type.All Tile Restoration services require a minimum of72 <br /> of cure time before they can be exposed to moisture.If this timeline is not adhered to the customer takes fill responsibility for any damage or per&mnance issues that may result.*Epoxies chalk and <br /> yellow with age,extended exposure to UV and artificial lighting.Lack of ventilation,incomplete mixing,miscatalyzation or the use ofheaters that emit carbon dioxide and carbon monoxide during <br /> application and initial <br /> stages of curing may muse amine blush,possibly acting adhesion of subsequent topcoats. <br /> TRI marketing will send periodic email communication infomring you of various service offerings.Al any time you wish to stop receiving this information you may opt out from within the email <br /> received or contact our office. **Tile Restoration will take all precaution to protect adjoining flooring,walls,materials etcetera from exposure to water and/or chemicals.Any damage that may <br /> occur from contact from water and/or chemical is not the responsibility of Tile Restoration Inc.and its staff Any changes or additional work required or requested by the owner,will be done at an <br /> additional charge and must be written.I hereby give Tile Restoration Inc.authorization to do the work specified and payment will be made as outlined above. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.