Browse
Search
Agenda - 04-10-2006 - 9b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 04-10-2006
>
Agenda - 04-10-2006 - 9b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 8:48:44 AM
Creation date
8/29/2008 9:19:38 AM
Metadata
Fields
Template:
BOCC
Date
4/10/2006
Document Type
Agenda
Agenda Item
9b
Document Relationships
Minutes - 20060410
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
RES-2006-028 Approve ordinance for Special Use Permit Clas A for Partnership Academy Alternative School for Orange Co
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i State of North ACarolina Reviewing Office: <br />s <br />(NCDENR Department of Environment and Natural Resources Project NumbeF!'0" -0 2,Z0Due Date: <br />INTERGOVERNMENTAL REVIEW - PROJECT COMMENTS <br />After review of this project it has been determined that the DENR permit(s) and /or approvals indicated may need to be obtained in order for this project <br />to comply with North Carolina Law. Questions regarding these permits should be addressed to the Regional Office indicated on the reverse of this form. <br />All applications, information and guidelines relative to these plans and permits are available from the same Regional Office.. <br />PERMITS <br />SPECIAL APPLICATION PROCEDURES or REQUIREMENTS <br />Normal Process Time <br />(Statutory Time Limit) <br />L] <br />Permit to construct & operate wastewater treatment <br />Application 90 days before begin construction or award of construction <br />30 days <br />facilities, sewer system extensions & sewer systems <br />contracts. On -site inspection Post - application technical conference usual, <br />(90 days) <br />not discharging into state surface waters. <br />0 <br />NPDES- permit to discharge into surface water and /or <br />Application 180 days before begin activity. On -site inspection preapplication <br />permit to operate and construct wastewater facilities <br />conference usual. Additionally, obtain permit to construct wastewater treatment <br />90 -120 days <br />discharging into state surface waters. <br />facility- granted after NPDES Reply time, 30 days after receipt of plans or issue <br />N/A) <br />of NPDES permit - whichever is later <br />0 <br />Water Use Permit <br />Preappiication technical conference usually necessary <br />30 days <br />(N/A) <br />Well Construction Permit <br />Complete application must be received and permit issued prior to the <br />7 days <br />installation of a well <br />(15 days) <br />LJ <br />Dredge and Fill Permit <br />Application copy must be served on each adjacent riparian property owner. <br />55 days <br />y <br />On -site inspection Preapplication conference usual. Filling may require Easement <br />(90 days) <br />to Fill from N C. Department of Administration and Federal Dredge and Fill Permit <br />ll <br />Permit to construct & operate Air Pollution Abatement <br />facilities and /or Emission Sources as per 15 A NCAC <br />N/A <br />60 days <br />(2Q.0100, 2Q 0300.2H 0600) <br />vi <br />Any open burning associated with subject proposal <br />' <br />must be 1n compliance with 15 A NCAC 2D.1900 <br />Demolition or renovations of structures containing <br />asbestos material must be in compliance with <br />60 days <br />15 A NCAC 2D.1110 (a) (1) which requires notification <br />N/A <br />(9D days) <br />and removal prior to demolition. Contact Asbestos <br />Control Group 919- 733 -0820. <br />L] <br />Complex Source Permit required under 15 A NCAC <br />2D.0800 <br />The Sedimentation Pollution Control Act of 1973 must be properly addressed for any land disturbing activity. An erosion & sedimentation <br />control plan will be required if one or more acres to be disturbed. Plan filed with proper Regional Office (Land Quality Section) at least 30 <br />20 days <br />days before beginning activity A fee of $40 for the first acre or any part of an acre <br />(30 days) <br />Ll <br />The Sedimentation Pollution Control Act of 1973 must be addressed with respect to the referenced Loral Ordinance. <br />30 days <br />Mining Permit <br />On -site inspection usual. Surety bond filed with DENR. Bond amount varies with <br />type mine and number of acres of affected land. Any are mined greater than <br />30 days <br />one acre must be permitted. The appropriate bond must be received before <br />(60 days) <br />the permit can be issued, <br />North Carolina Burning permit <br />On -site inspection by NC Division of Forest Resources if permit exceeds 4 days <br />1 day <br />(N /A) <br />Special Ground Clearance Burning Permit -22 counties <br />On -site inspection by N. C. Division of Forest Resources required *if more than five <br />i day <br />in coastal N C..with organic soils <br />acres of ground clearing activities are involved. Inspections should be requested <br />(N /A) <br />at least ten days before actual burn is planned' <br />Oil Refining Facilities <br />N/A <br />9D -120 days <br />(N /A) <br />Q <br />Dam Safety Permit <br />If permit required, application 60 days before begin construction, Applicant <br />must hire N qualified engineer to: prepare plans, inspect construction, certify <br />construction is according to DENR approved plans. May also require permit under <br />mosquito control program.and a 404 permit from Corps of Engineers.. <br />30 days <br />An inspection of site is necessary to verify Hazard Classification. A minimum <br />(60 days) <br />fee of S200,00 must accompany the application -. An additional processing fee <br />based on a percentage or the total project cost will be required upon completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.