Orange County NC Website
® ® CORLEY REDFOOT ZACK INC <br />A R C H I T E C T S • E N G I N E E R S • P L A N N E R 5 <br />December 20, 2005 <br />PARTNERSHIP ACADEMY ALTERNATIVE SCHOOL <br />FOR ORANGE COUNTY SCHOOLS <br />1008 Storey Lane <br />Hillsborough, NC <br />RESOURCES MANAGEMENT PLAN <br />A, Protection of natural resources, i.e., habitat maintenance, existing vegetation and mitigation of <br />environmentally sensitive areas: <br />1. The project is adjacent to existing Storey Lane and therefore utilizes the existing Storey Lane <br />roadway to provide access to the site. This siting eliminates the need for additional access <br />roads. The location of the proposed site is along the southwestern edge of the property on <br />existing road frontage (NC 86 an d Storey Lane), allowing the remaining 18.5 acres to remain <br />intact. Disturbance of the site is limited to areas already developed along the roadways. The <br />remaining unbroken tract of land creates a large area for animal habitat and protects sensitive <br />areas, such as, the drainage way, intermittent stream which flows under NC 86 and through <br />the site.. <br />B Ownership and maintenance of open spaces: <br />1, All open spaces on the site will be owned by Oran ge County. Landscaped buffers and <br />stream buffers are available throughout the site. <br />C. Solid Waste Plan Stormwater Management Plans: <br />1. Stormwater management will be provided by the installation of a bioretention area on the <br />northwest comer of the proposed construction site.. This water treatment facility will treat <br />runoff from the building and parking lot areas. A grass -lined Swale is provided around the <br />buildings and parking areas to further treat runoff prior to its release through a level <br />spreader or the bioretention area. Erosion control is provided by a sediment basin and <br />skimmer at the location of the future bioretention area and silt ditches and fences which <br />direct <br />esult in removal of 85% tof the total suspended solids as Management <br />quired by the State ofrNorth <br />ill <br />Carolina. <br />2. The Solid Waste Management Plan at this facility will incorporate the trash and recycling <br />facilities on the Stanback Middle School site, which is located south of the project on Storey <br />Lane. Stanback's existing trash dumpster and recycling carts will be available for waste and <br />recycling items generated by the Alternative School, <br />D. Handling of land - clearing debris: <br />1. The construction of the school will include the requirement for chipping and grinding of the <br />land - clearing debris and utilizing it as mulch around the project and its adjacent site <br />Michael . Hanunersley, PE <br />0508 -rmp <br />PO Box 2368 • Chapel Hill, NC 27515 -2368 • (919) 942 -8586 Telephone • (919) 929 -4802 Fax <br />