Browse
Search
Agenda - 04-10-2006 - 9b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 04-10-2006
>
Agenda - 04-10-2006 - 9b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 8:48:44 AM
Creation date
8/29/2008 9:19:38 AM
Metadata
Fields
Template:
BOCC
Date
4/10/2006
Document Type
Agenda
Agenda Item
9b
Document Relationships
Minutes - 20060410
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
RES-2006-028 Approve ordinance for Special Use Permit Clas A for Partnership Academy Alternative School for Orange Co
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Corley Redfoot Zack, Inc- January, 2006 !� <br />Partnership Academy Alternative School <br />from additional impervious surface area will be mitigated through the use of <br />stormwater control devices, such as, bioretention areas, infiltration areas, underground <br />storage, and inlet controls. <br />G. References: <br />Natural Heritage Program List of Rare Plant Species of North Carolina 2004 <br />Natural Heritage Program List of the Rare Animal Species of North Carolina 2004 <br />Subsurface Explorations Report by Trigon Engineering Consultants, Inc., dated <br />December 20, 2005. <br />United States Department of Agriculture, Soil Conservation Services, "Soil Survey of <br />Orange County, North Carolina ", June, 1977, <br />Wetlands Survey by Trigon Engineering Consultants, lnc., dated December 23, 2005. <br />H. State and Federal Permits Required: <br />An NCDENR Erosion Control Permit is required prior to beginning grading activities. No <br />work shall take place at the site until an erosion control plan has been approved. <br />I, Conclusion Statement: <br />After preparation and review of this Environmental Assessment, it is anticipated that the <br />responsible state agency will conclude that there is a Finding of No Significant Impact <br />(FONSI).. <br />EXHIBITS (Attached) <br />Exhibit #I: <br />Overall Site Plan <br />Exhibit #2: <br />Existing Conditions Plan <br />Exhibit #3: <br />Enlarged Site Plan <br />Exhibit #4: <br />Grading and Storm Drainage Plan <br />Exhibit #5: <br />Site Location Map <br />o50iifonsi <br />1.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.