Browse
Search
Agenda - 09-05-2017 - 8-m - Unified Development Ordinance (UDO) and Zoning Atlas Amendment Outline – Flood Damage Prevention Regulations and Special Flood Hazard Area (SFHA) Overlay District
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 09-05-2017 - Regular Mtg.
>
Agenda - 09-05-2017 - 8-m - Unified Development Ordinance (UDO) and Zoning Atlas Amendment Outline – Flood Damage Prevention Regulations and Special Flood Hazard Area (SFHA) Overlay District
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2017 10:58:27 AM
Creation date
9/5/2017 10:57:18 AM
Metadata
Fields
Template:
BOCC
Date
9/5/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8m
Document Relationships
Minutes 09-05-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> permit or a stormwater management plan will be required based on <br /> the anticipated/proposed level of land disturbance, <br /> j. The presence of conservation or utility easements impacting the <br /> location of structure and/or utility systems (i.e. well and septic), and <br /> k. Soil types on a property. <br /> Staff is also able to provide electronic copies of flood maps and other similar <br /> data denoting flood prone areas on your property as part of this service. <br /> During the preparation of this map staff identifies any and all regulations <br /> impacting the overall development of the property and provides direction on <br /> how you can address compliance. <br /> Please remember to always check with the Planning Department before you <br /> initiate construction or land disturbing activities, or deposit fill material, on <br /> your property in order to avoid unnecessary problems with respect to <br /> compliance established regulations. <br /> You do not need to schedule an appointment to obtain a site assessment, <br /> which any staff person can complete during normal business hours at our <br /> main office located on the second floor of the West Campus Office building <br /> located at 131 West Margaret Lane in downtown Hillsborough. <br /> 2. ASSISTANCE WITH FLOOD REGULATIONS: <br /> The Planning Department is able to provide assistance, with respect to <br /> existing flood regulations and FIRM data, on the following: <br /> a. Base Flood Elevations as denoted on the most recent FIRM, <br /> b. 100 and 500 year floodplain maps, <br /> c. Archived FIRM maps and flood data, <br /> d. Cross section elevations at selected locations, <br /> e. Approximate location of parcel lines, <br /> f. Zoning and watershed overlay designations, <br /> g. 2 foot topographic contour lines, <br /> h. Approximate location(s) of structure(s) utilizing aerial photographic <br /> data, <br /> i. Any FIRM adjustment approved through the Letter of Map <br /> Amendment (LOMA) or Letter of Map revision (LOMR) process, <br /> and <br /> j. Elevation Certificates for certain parcels. <br /> As previously indicated herein the County has made available a variety of <br /> documents on existing flood data and local guidelines. Staff will be more than <br /> happy to schedule a formal meeting to review any issues, concerns, or <br /> questions you may have regarding our flood program. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.