Orange County NC Website
Engineering is working with Public Works to review windows, lighting fixtures, plumbing <br />features, HVAC and other building aspects as referenced by Innovative Design in their report to <br />the Board on "green technologies ", in keeping with the Board's goals countywide of conserving <br />fuel and water resources. The recently established Energy Conservation Team met at the <br />Center in early March to examine conservation options including geo- thermal, radiant heating, <br />solar heating, and the like. A follow up meeting with the conservation team and "green building" <br />and solar representatives is being scheduled for later in April. <br />Park <br />The proposed timeline for the Northern Park project, based upon the Board approved Master <br />Plan is shown in Attachment A. ERCD notes that an RFP for engineering services and permits <br />is being distributed. <br />Recreation and Parks was recently asked by community representatives to create a temporary <br />walking track on the front lawn of the building, as a transitional amenity until a permanent trail <br />could be completed. The participants in the Northern Park Master Plan effort reconvened on <br />April 5 to consider and comment on the proposal shown in Attachment B. <br />Four participants attended the meeting and three were in favor of the temporary walking track <br />with one opposed. Those present also asked that the temporary track not be considered a <br />replacement for the permanent walking track included within the Master Plan. <br />Recreation and Parks is prepared to move forward with the project, with this consideration, if <br />the Board so approves. <br />_ _. <br />The Public Works department worked with Recreation and Parks staff to complete renovations <br />and improvements (new flooring, paint, cabinetry, etc.) for the creation of a senior's room in the <br />northern sector of the building, and with Library staff to create the branch Library in early 2004. <br />Public Works also repainted interior corridors and exterior entryways, replaced worn pipe <br />insulation in several rooms, re -keyed locks throughout the building to the County keying system, <br />and coordinated installation of the newly lighted sign at this time. <br />In early 2005, Public Works staff worked with Recreation and Parks for the creation of a kiln <br />room. <br />The in- progress, updated roof assessment will look at energy efficient replacement options, as <br />well as examining the structural needs related to solar system components, etc. that may be <br />installed on the roof. <br />Programs <br />Recreation and Parks <br />Recreation and Parks provides trips, craft and exercise classes for the senior citizen group <br />housed at Northern, and also facilitates meetings and activities scheduled by groups and <br />individuals in the various meeting rooms. <br />