Browse
Search
Agenda - 11-16-1993 - VIII-B (2)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 11-16-1993
>
Agenda - 11-16-1993 - VIII-B (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2017 11:36:55 AM
Creation date
8/16/2017 11:33:40 AM
Metadata
Fields
Template:
BOCC
Date
11/16/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br /> the construction of non-discharging landfills only. The majority of the site is not in a <br /> protected watershed. <br /> OC 11 is located on the east side of Miller Road south of Walker Road. The eastern portion <br /> of the site is located in the portion of the Lower Eno watershed classified as WS-IV. There <br /> are no restrictions pertaining to landfills in this area. The northernmost portion of the site <br /> extends into Little River Watershed (WS-I1). This classification allows for the construction <br /> of non-discharging landfills only. The western portion of the site is not in a protected <br /> watershed. <br /> OC17 is located on the north side of Eubanks Road, and is not in a protected watershed. <br /> 5. What implications do the watershed standards, particularly impervious surface ratios, <br /> have for the location and development of recycling center sites in the watersheds? <br /> Site acquisition costs are affected by the lot size required in order to comply with the <br /> applicable impervious surface limit and/or provide adequate area for BMPs. Site <br /> development costs are significantly increased if construction of a BMP is required. <br /> Assumptions: <br /> a. Recycling centers are not located outside of Critical Areas. <br /> b. Each recycling center uses one acre of impervious surface. <br /> Total Acreage Requirements: <br /> Upper Eno and Back Creek Watersheds <br /> 8.3 acres (without BMP) <br /> OR <br /> 1.4 acres minimum, plus additional area as needed for BMP. <br /> Little River. Flat River. South Hyco Creek. University Lake and Cane Creek Watersheds <br /> 1.4 acres (no BMP required) <br /> Hay{ River, Lower Eno. Jordan Lake Watersheds <br /> 2.8 acres (without BMP) <br /> OR <br /> 1.4 acres minimum, plus additional area as needed for BMP. <br /> 6. What are the implications of adopting the State's impervious surface standard (70% for <br /> no more than 5% of the watershed) for other types of nonresidential uses; e.g., <br /> churches, commercial buildings, etc.? <br />
The URL can be used to link to this page
Your browser does not support the video tag.