Browse
Search
Agenda - 11-16-1993 - VII-C (2)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 11-16-1993
>
Agenda - 11-16-1993 - VII-C (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2017 11:29:48 AM
Creation date
8/16/2017 11:29:37 AM
Metadata
Fields
Template:
BOCC
Date
11/16/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VII-C
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> within one hundred feet of the existing well, the well must be <br /> relocated in accordance with state health regulations. The only <br /> alternative to relocating the well would be to acquire nearby <br /> land where the nitrification field can be located. It is <br /> probable that the cost of land acquisition would exceed the cost <br /> of relocating the well. The cost of the new treatment system and <br /> associated modifications to the existing facility is estimated to <br /> be approximately $35, 000. A cost breakdown is outlined below. <br /> 3500 gallon septic tank, installed 3000 <br /> 3500 gallon pump tank, installed 3500 <br /> 1000 gallon grease trap (2 ) , installed 2000 <br /> 3000 linear feet nitrification line 13,000 <br /> Nitrification field dual header system, installed 2000 <br /> Miscellaneous yard piping, new and modified 3000 <br /> Effluent pumps (2 ) installed 1500 <br /> Pump control panel installed 1500 <br /> New 6 inch well 5500 <br /> Total $ 35,000 <br /> The outlined improvements to the Northern facility' s waste <br /> treatment system, along with the quality and depth of on-site <br /> soils, should provide adequate waste treatment capacity for the <br /> existing uses of the Northern facility for many years to come. <br /> The cost is significant, but the only alternative is to close the <br /> facility within twelve months. Staff will provide any additional <br /> information or answer questions as required by the BOCC or the <br /> County Manager. <br />
The URL can be used to link to this page
Your browser does not support the video tag.