Orange County NC Website
2 <br /> County staff have also developed a preliminary design for an on-site <br /> non-discharging ground absorption waste treatment system as an <br /> alternative to permanently closing the facility or acquiring and <br /> developing an off-site treatment capability. The estimated cost of <br /> implementing on-site treatment is approximately $35,000. The costs of <br /> closing the facility or developing off-site waste treatment are <br /> unknown. <br /> RECOMMENDATION: The Manager recommends that the Board receive the <br /> report and determine if it wishes to authorize the expenditure of <br /> budgeted and available capital improvement funds to develop the on-site <br /> waste treatment capacity. <br />