Browse
Search
2017-380-E AMS - Warren-Hay Mechanical Contractors Inc. to replace roof top unit at Seymour Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-380-E AMS - Warren-Hay Mechanical Contractors Inc. to replace roof top unit at Seymour Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2018 2:01:43 PM
Creation date
8/8/2017 9:48:55 AM
Metadata
Fields
Template:
Contract
Date
8/14/2017
Contract Starting Date
8/14/2017
Contract Ending Date
12/31/2017
Contract Document Type
Agreement - Construction
Amount
$28,616.00
Document Relationships
R 2017-380-E AMS - Warren-Hay Mechanical Contractors Inc. to replace roof top unit at Seymour Center
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9727DCA-8BA0-4433-8835-A8F70B3CA970 <br /> Mechanical Contractors Inc. <br /> Heating and Air Conditioning <br /> P.O.Box 818 •Hillsborough,NC 27278 <br /> 919-732-4362 <br /> December 5,2016/July 13,2017 <br /> Orange County Public Works <br /> Re; Seymour Center HVAC Replacement <br /> PROPOSAL <br /> We hereby submit specifications and estimates for: As noted: RTU-2 <br /> • Provide&install(1) 12.5 Ton Roof top gas package to replace existing RTU-2 as <br /> requested.Reconnect to existing gas piping,power wiring,controls,placing unit back on <br /> existing curb. <br /> • Provide permit,required inspections,start-up and 1 year general warranty. <br /> We propose hereby to furnish material and labor: $12,946.00 <br /> Payment to be made as job progresses. <br /> Acceptance: Date: Amt: <br /> Exclusions/Clarifications: <br /> • Expedited shipment <br /> • Reconnecting to all existing controls, control wiring,power wiring, disconnects <br /> and roof penetrations. <br /> 'f `f <br /> / / <br /> Accepted by: . '� Date: / 1 / % , <br /> Respectfully submitted by:Ron LaPann Commercial Division,quote valid for 30 days. ron.lapann(cilwarren-hay.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.