Browse
Search
2017-357-E DEAPR - S&ME, Inc. for assessment of former Hillsborough landfill at Fairview Park
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-357-E DEAPR - S&ME, Inc. for assessment of former Hillsborough landfill at Fairview Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2018 11:14:53 AM
Creation date
8/2/2017 4:51:18 PM
Metadata
Fields
Template:
Contract
Date
8/1/2017
Contract Starting Date
8/1/2017
Contract Document Type
Agreement - Consulting
Amount
$50,000.00
Document Relationships
R 2017-357-E DEAPR - S&ME, Inc. for assessment of former Hillsborough landfill at Fairview Park
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 57E297CC-03C0-463C-B17A-569B0EAC735F <br /> 3.1.2 The Basic Services will be performed by the Consultant in accordance with the <br /> following schedule: (Insert task list and milestone dates) <br /> Task Milestone Date <br /> 1. Tasks necessary to assess the extent of soil and groundwater contamination at the <br /> former Hillsborough landfill will be determined and conducted in a reasonable timeframe in <br /> accordance with the Work Plan that will be developed with, and approved by, the NC Division of <br /> Waste Management Inactive Hazardous Sites Branch. <br /> 2. <br /> 3. <br /> 4. <br /> 5. <br /> 6. <br /> 7. <br /> 8. <br /> 9. <br /> 10. <br /> 3.1.3 Should County reasonably determine that Consultant has not met the Milestone <br /> Dates established in Section 3.1.2 of this Article, County shall notify Consultant of the failure to <br /> meet the Milestone Date. The County, at its discretion may provide the Consultant seven (7) <br /> days to cure the breach. County may withhold the accompanying payment without penalty until <br /> such time as Consultant cures the Breach. In the alternative, upon Consultant's failure to meet <br /> any Milestone Date the County may modify the Milestone Date schedule. Should Consultant or <br /> its representatives fail to cure the breach within seven (7) days, or fail to reasonably agree to <br /> such modified schedule County may immediately terminate this Agreement in writing without <br /> penalty or incurring further obligation to Consultant. This section shall not be interpreted to <br /> limit the definition of breach to the failure to meet Milestone Dates. <br /> ARTICLE 4 DURATION OF SERVICES <br /> 4.1 Scheduling of Services <br /> 4.1.1 The Consultant shall schedule and perform his activities in a timely manner so as <br /> to meet the Milestone Dates listed in Article 3. <br /> 4.1.2 Should the County determine that the Consultant is behind schedule, it may require <br /> the Consultant to expedite and accelerate his efforts, including providing additional resources <br /> and working overtime, as necessary, to perform his services in accordance with the approved <br /> project schedule at no additional cost to the County. <br /> 4.1.3 The Commencement Date for the Consultant's Basic Services shall be August 1, <br /> 2017, pending NC Division of Waste Management Inactive Hazardous Sites Branch approval of <br /> Work Plan detailing the work to be performed at the former Hillsborough landfill. <br /> ARTICLE 5 COMPENSATION <br /> 5.1 Compensation for Basic Services <br /> Revised 2/17 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.